TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

Geotechnical Survey work announced at Berwick Bank wind farm

4C Offshore | Chloe Emanuel
By: Chloe Emanuel 27/03/2024 KIS-ORCA

Mariners are advised that SSE Renewables will be returning to Berwick Bank wind farm area to undertake further Geotechnical survey work. The survey will be within the proposed Berwick Bank Wind Farm site boundary. It should be noted that SSE Renewables are not expecting fishermen to relocate gear - on this occasion the vessel(s) will work around any gear on location. A guard vessel will also be contracted to work alongside each survey vessel. 

The survey work is being undertaken by Fugro and will be conducted from two vessels: the Scout and the Quest. The geotechnical survey is due to start on 27 October 2023. The scouting/guard vessel will be the Morning Dawn. 

The survey will mobilise 27 October 2023 lasting approximately 5 months. To account for all eventualities, we would like to extend the duration to 30 April 2024. The survey will involve borehole sampling, using the Geobor-S coring system or similar, with the number and location of the boreholes yet to be finalised.


For more intelligence on component trends for turbines, installation vessels, specifications and supply & demand analysis, click here.

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo

Trending News!