Offshore Wind
Transmission
Vessels
Ports
4C is now TGS
We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.
Alstom’s 1MW tidal turbine, deployed in 2013 as part of the ReDAPT[1] project, at EMEC’s tidal test site, has demonstrated its endurance, autonomous running and performance, generating at its full nominal power since July 2013. Previously, the 500 kW tidal stream turbine had already generated electricity into the national grid after its connection In September 2010at the Fall of Warness.
Together, both tidal turbines have therefore produced over 1GWh of power to feed the local grid. Alstom has taken advantage of this significant experience to improve the design of its tidal stream turbine and now offers the Oceade™ 18 - 1.4 MW, an even more efficient, cost-effective and easy to maintain device. The Oceade is ready to be deployed at the tidal energy farm that will be selected in the call for expressions of interest launched in September 2013 by the French government.
Premium
4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.