Alpha Ventus
60 MW Fully Commissioned Germany

"The database provides a great opportunity for market research and awareness."

Leo Hambro, Tidal Transit Limited

  • All Projects
  • Followed Projects

Latest Windfarm News
Swedish steel for floating platforms
Maritime Journal
Swedish steel specialist SSAB is entering into an agreement with Hexicon AB to develop far off shore wind farm platforms. The combined technology will offer advantages within the market for renewable energy. A first demonstration unit is planned for ...
Source: news.google.com
17/09/2014 21:26:50

Mass. studies UK offshore wind
Recharge
Patrick – a staunch renewables supporter and possible future US presidential contender for the Democratic Party – met with Andrew Jamieson, chief executive of the UK's Offshore Renewable Energy Catapult, to discuss barriers to entry in the offshore wind ...
Source: news.google.com
17/09/2014 16:47:11

Baltic 2 platform on the move
Recharge
The platform will bundle electricity from the offshore wind turbines and transform 33kV power into 150kV electricity that will be transported via subsea cables to land from the wind farm 32km north of the island of Rügen. EnBW in late August had started ...
Source: news.google.com
17/09/2014 14:29:16

Department of Energy Pumps Money into Offshore Wind Energy
IPWatchdog.com
A developed network of offshore wind turbines could power the entire United States of America. According to the National Renewable Energy Laboratory, there is a potential 4.15 gigawatts of energy which can be collected from offshore wind collection around ...
Source: news.google.com
17/09/2014 15:39:52

Atlas Professionals enters framework agreement for provision of offshore wind ...
Renewable Energy Magazine (press release)
Offshore wind energy has huge potential and I am pleased that our professionals will assist DONG Energy with their UK projects and in turn further increase their aim to successfully develop, construct and operate offshore wind farms in Northern Europe.”.
Source: news.google.com
17/09/2014 11:23:18

RWE talks shop on Triton grid
reNews
RWE has unwrapped the blueprint for community consultations on the onshore electrical works for its proposed up to 900MW Triton Knoll offshore wind farm in the east of England. Adverts have been placed in local newspapers in Lincolnshire containing the ...
Source: news.google.com
17/09/2014 06:04:32

Harnessing the wind
Sequim Gazette
William Shaw, atmospheric chemistry and meteorology scientist for Pacific Northwest National Laboratory, explains the technologically advanced and distinct instruments each buoy is equipped with to gather unique off-shore wind energy data in the open ...
Source: news.google.com
16/09/2014 23:51:34

Canada falls behind global growth of offshore wind power: report
The Globe and Mail
Currently, Britain has the most offshore wind farms of any country, with about half of the worldwide capacity. While it will see more installed in the next few years – reaching 11 GW by 2020 – Britain's worldwide share will decrease to less than 30 per cent, the ...
Source: news.google.com
16/09/2014 22:06:18

A Million-Dollar Buoy Will Spot the Best Sites for Wind Farms
Gizmodo India
With roughly 12,383 miles of coastline, the US has plenty of potential installation sites for offshore wind farms. Floating data collection centers like the one shown above will help energy companies and government agencies alike find the windiest, and most ...
Source: news.google.com
16/09/2014 19:55:23

Wind Energy O&M Market Global Research and Analysis 2018
DigitalJournal.com
Good O&M practices can optimize the profitability of wind farms, thereby ultimately reducing the downtime of the turbines or leading to the extension of their lifespan. O&M also tends to be high for offshore wind energy systems compared to the terrestrial wind ...
Source: news.google.com
16/09/2014 18:05:55



map not available
Developers/Owners/Operators
Project Details for Alpha Ventus
General Information Name Alpha Ventus correct
Other names Borkum West I correct
Country name Germany correct
Region Exclusive Economic Zone (DolWin) (BSH Cluster 2 in Draft Network Plan) correct
Comments Also known as Borkum West I.

Wind Park made up of 6 Multibrid M5000 turbines (Rotor Diameter 116m, Hub Height 90m Total height 148m, Tripod) and 6 REpower turbines (Rotor Diameter 126m, Hub Height 92m Total height 155m, Jacket).

An added benefit of the wind farm is that colonies of oysters, crabs and anemones have begun to populate the turbine bases.
correct
Round (or category) correct
Development status Fully Commissioned correct
Comments on the status correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 60 MW correct
Turbine Model M5000-116 (Areva Wind), REpower 5M correct
Turbine Capacity 5 MW correct
Number of Turbines 12 correct
Total Turbine Height 150 m correct
Hub Height 92.00 m correct
Rotor Diameter 116 m correct
Foundation Various (Tripod and Jacket) correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost EUR(mill) 250.00 correct
Location & Environment Sea name North Sea correct
Centre latitude 54.010° correct
Centre longitude 6.606° correct
Area 4 km2 correct
Depth range (Chart Datum) 28 m - 30 m correct
Depth range stated by developer 33 m - 45 m correct
Distance From Shore (reported) 56 km correct
Distance From Shore (computed from centre) 56 km correct
Ports Installation base Wilhelmshaven/Bremerhaven correct
Ops and maintenance Eemshaven correct
Grid Converter platforms None correct
Offshore transformers Alpha Ventus Substation correct
Grid connection point Hagermarsch correct
Cable landing point Hilgenriedersiel correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 1 correct
Average length per cable 60 km correct
Transmission type (e.g. HVAC) HVAC correct
Nominal voltage 110 kV correct
Maximum voltage correct
Power rating correct
Number of cores 3 correct
Conductor type Cu correct
Section Area 240 mm2 correct
Insulation XLPE correct
Number fibre optics 48 correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length 16 km correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 33 kV correct
Maximum voltage correct
Burial depth 0.6 m correct
Number of cores 3 correct
Conductor type Cu correct
Section 240 mm2 correct
Insulation correct
Power rating correct
Number of fibre optics 48 correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 39140 correct
CO2 reduced per year 79103 tonnes correct
SO2 reduced per year 1840 tonnes correct
Expected life 20.0 years correct
Other Website Visit correct