BARD Offshore 1
400 MW Partial Generation/Under Construction Germany
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
EastPort UK, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 11 m
Entrance Width: 210 m
Spring Tidal Range: 1.96 m
Quay Length: 1400 m
Quay Loading Capability: 3 tonnes/m2
Land for Development: 12 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
12
VesselRoleOrganisationDescriptionCorrect
Maersk Recorder Vessel-Array Cable Installation(burial) CTC Marine Projects (now rebranded as DeepOcean) Maersk Recorder mobilized with WROV and CMROV 4 jet trenching ROV for 112km cable lay for - Client: Norddeutsche Seekabelwerke GmbH (NSW) correct
Maersk Recorder Vessel-Array Cable Installation(cable lay) CTC Marine Projects (now rebranded as DeepOcean) Maersk Recorder mobilized with WROV and CMROV 4 jet trenching ROV for 112km cable lay for - Client: Norddeutsche Seekabelwerke GmbH (NSW) correct
MV Seabed Worker Vessel-Export Cable Installation(burial) Seabed Shipping AS Period: 25-Aug-2010 to 08-Nov-2010
MV Seabed worker used for cable lay and burial of the 2 x 1km cables between substation and convertor station - Client: Offshore Marine Management (OMM) More...
correct
MV Seabed Worker Vessel-Export Cable Installation(cable lay) Seabed Shipping AS Period: 25-Aug-2010 to 08-Nov-2010
MV Seabed worker used for cable lay and burial of the 2 x 1km cables between substation and convertor station - Client: Offshore Marine Management (OMM) More...
correct
Wind Lift 1 Vessel-Foundation Installation(turbine) BARD Building GmbH Period: 27-Mar-2010
Installation of the 80 tripile foundations(240 piles) More...
correct
Meander Vessel-Support Eksmaris Shipping & Forwarding The Meander tug boat supported the Thor and WIndlift vessels with anchor handling, crew change, equipment supply, towage and buoy positioning. correct
MCS Alix Vessel-Support Eksmaris Shipping & Forwarding The MCS Alix tug boat supported the Thor and WIndlift vessels with anchor handling, crew change, equipment supply, towage and buoy positioning. correct
Wind Lift 1 Vessel-Transition Piece Installation(turbine) BARD Building GmbH Period: 27-Mar-2010
Installation of the 80 tripile foundation Transitions More...
correct
Natalia Bekker Vessel-Transportation BARD Service GmbH Period: 09-Apr-2010
The Natalia Bekker is being used as a personnel transport vessel More...
correct
Taurus Vessel-Transportation Harms Bergung Transport & Heavylift GmbH & Co. KG Period: Nov-2009
AHT TAURUS was contracted by Bard Engineering to take over the tow of the transformer platform BARD 1 from the Bristol Channel to Flushing in November 2009.
correct
12
Vessels & Equipment Available for Immediate Charter
Statistics for BARD Offshore 1
Wind Farm Name BARD Offshore 1 (also known as BARD) correct
CountryGermany
Region Exclusive Economic Zone (BorWin) correct
SeaName North Sea correct
Centre Latitude 54.355°
Centre Longitude 5.980°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Partial Generation/Under Construction correct
Comments on the Status 
Status Documentation This is the Approval Document
Capacity 400 MW correct
Turbine Capacity 5 MW correct
Number of Turbines 80 correct
Turbine Model Bard 5.0 (Bard) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 122 m correct
Total Turbine Height 151 m correct
Hub Height 90 m correct
Other comments The wind farm will be connected to the BorWin1 grid connection. correct
Foundation Grounded: Tripile correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 59 km2
Water Depth Min (Chart Datum) 39 m correct
Water Depth Max (Chart Datum) 41 m correct
Depth range stated by developer 40 m - 40 m correct
Distance From Shore (reported) 101 km correct
Distance From Shore (computed from wind farm centre) 111.9 km
Export Cable Length 1 km correct
Infield Cable Length 107 km correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 155 kV correct
Infield Cable Capacity 33 kV correct
Number of Export Cables correct
Export Cable Type correct
Cable Description Export cable will connect BARD Offshore 1 substation to BorWin 1 correct
Number of Offshore Substations 1 correct
Grid Connection Point Borwin1 (alpha) Offshore Platform - Diele Substation (Onshore) correct
Cable Landing Point Hilgenriedersiel correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost EUR(mill) 1500.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 223,660 homes
CO2 Reduced Per Year 452,016 tonnes
SO2 Reduced Per Year 10,512 tonnes
Website Visit correct

Events on BARD Offshore 1
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Estimated Year Full Commissioning due to delays Subscribe correct
27-Jan-2012
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
30 of the 80 turbines have been installed. Visit correct
2011
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
The array cable installation will finish in 2011 Other correct
03-Dec-2010
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Turbine 'S-5-4' is the first to feed power to BorWin 1 at 11.35pm Visit correct
02-Dec-2010
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
The cables have been installed connecting the wind farm to the BorWin Alpha substation. Other correct
May-2010
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
The array cable installation started in May 2010 Other correct
08-Apr-2010
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
First foundation has been installed Visit correct
27-Mar-2010
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Construction started Other correct
11-Apr-2007
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Consent granted Visit correct
25-Mar-2004
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
Date of application to BSH Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on BARD Offshore 1 offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for BARD Offshore 1 More weather tools available on 4C Interactive Map. More weather forecast tools