Latest event on Dogger Bank - Creyke Beck B

Statkraft sold its 25% stake in the Dogger Bank projects to Statoil and SSE. Both Statoil and SSE own 37.5% of the project. Read more

Latest Update: 23 March 2017

Developers/Owners/Operators Database in Excel | Add Your Organisation
Project Details for Dogger Bank - Creyke Beck B Database in Excel
Name Dogger Bank - Creyke Beck B correct
Other names Zone 3 correct
Country name United Kingdom correct
Region England, North East correct
Comments Dogger Bank Creyke's application to the government suggests a maximum of 4 substations for each project.

Creyke Beck is the first area to be developed in the Dogger Bank zone and is found within Tranche A.

The consent application submitted for Creyke Beck allows for up to 400 wind turbines in total, therefore currently 200 have been split across the two phases until further information is available.

July 2014 The Crown Estate invited all Round 3 developers to revise the terms of their agreement as the projects transition from zone appraisals to project development. This could mean that zone development agreements are replaced with project specific contractural agreements.
correct
Round (or category) Round 3 correct
Development status Consent Authorised correct
Comments on the status correct
Notice any Errors? You can keep this an open resource by submitting corrections!
Project capacity 1,000 MW - 1,200 MW correct
Turbine model Not Decided correct
Turbine capacity 10 MW correct
Number of turbines 200 correct
Total turbine height correct
Hub height correct
Rotor diameter correct
Foundation Grounded: (Monopile, multileg or gravity based.) correct
10 year mean wind speed (2000-2009) Available online now
Stated project cost correct
Sea name North Sea, Southern North Sea (Dogger) correct
Centre latitude 54.977° correct
Centre longitude 1.680° correct
Area 599 km2 correct
Depth range (Chart Datum) 20 m - 33 m correct
Depth range stated by developer 20 m - 35 m correct
Distance from shore (reported) 131 km correct
Distance from shore (computed from centre) 149 km correct
Installation base correct
Ops and maintenance correct
Converter/Collector platforms Dogger Bank Creyke Beck (Tranche A Project 2) Converter correct
Offshore transformers Dogger Bank Creyke Beck (Tranche A Project 2) Substation 1, Dogger Bank Creyke Beck (Tranche A Project 2) Substation 2, Dogger Bank Creyke Beck (Tranche A Project 2) Substation 3 correct
Grid connection point The converter station would be north of the A1079 between Beverley and Cottingham in the East Riding of Yorkshire. The cable route would then connect to the National Grid at the existing substation at Creyke Beck. correct
Cable landing point Between Barmstone and Ulrome. correct
Number of export cables 6 correct
Average length per cable 15.71 km correct
Transmission type (e.g. HVAC) HVAC correct
Nominal voltage correct
Maximum voltage correct
Power rating correct
Number of cores correct
Conductor type correct
Section area correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments Dogger Bank will use HVDC to export electricity to the shore along transmission cables. HVAC will be used between the collector and converter stations. Cable length and number of cables has been estimated where it is not yet decided by the developer. correct
Number of onshore cables correct
Average length per cable 32 km correct
Comments 30km of HVDC connection and a further 2km once converted to HVAC. correct
Array cable length correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) correct
Nominal voltage correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Homes powered annually 849906 correct
CO2 reduced per year 1717661 tonnes correct
SO2 reduced per year 39946 tonnes correct
Expected life correct
Website Visit correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
123
StatusName
Decommissioned Beatrice Demonstration Beatrice Demonstration
Decommissioned Blyth Blyth
Fully Commissioned Barrow Barrow
Fully Commissioned Burbo Bank Burbo Bank
Fully Commissioned Greater Gabbard Greater Gabbard
Fully Commissioned Gunfleet Sands Gunfleet Sands
Fully Commissioned Gunfleet Sands 3 - Demonstration Project Gunfleet Sands 3 - Demonstration Project
Fully Commissioned Gwynt y Môr Gwynt y Môr
Fully Commissioned Humber Gateway Humber Gateway
Fully Commissioned Hunterston Test Centre - Mitsubishi 7MW (onshore) Hunterston Test Centre - Mitsubishi 7MW (onshore)
Fully Commissioned Hunterston Test Centre - Siemens 6MW (onshore) Hunterston Test Centre - Siemens 6MW (onshore)
Fully Commissioned Hunterston Test Centre (onshore) Hunterston Test Centre (onshore)
Fully Commissioned Inner Dowsing Inner Dowsing
Fully Commissioned Kentish Flats Kentish Flats
Fully Commissioned Kentish Flats Extension Kentish Flats Extension
Fully Commissioned Levenmouth demonstration turbine Levenmouth demonstration turbine
Fully Commissioned Lincs Lincs
Fully Commissioned London Array London Array
Fully Commissioned Lynn Lynn
Fully Commissioned North Hoyle North Hoyle
Fully Commissioned Ormonde Ormonde
Fully Commissioned Rhyl Flats Rhyl Flats
Fully Commissioned Robin Rigg Robin Rigg
Fully Commissioned Scroby Sands Scroby Sands
Fully Commissioned Sheringham Shoal Sheringham Shoal
Fully Commissioned Teesside Teesside
Fully Commissioned Thanet Thanet
Fully Commissioned Walney Phase 1 Walney Phase 1
Fully Commissioned Walney Phase 2 Walney Phase 2
Fully Commissioned Wave Hub Wave Hub
Fully Commissioned West of Duddon Sands West of Duddon Sands
Fully Commissioned Westermost Rough Westermost Rough
Partial Generation/Under Construction Burbo Bank Extension Burbo Bank Extension
Partial Generation/Under Construction Dudgeon Dudgeon
Under Construction Galloper Galloper
Under Construction Race Bank Race Bank
Under Construction Rampion Rampion
Pre-Construction Aberdeen Offshore Wind Farm (EOWDC) Aberdeen Offshore Wind Farm (EOWDC)
Pre-Construction Beatrice Beatrice
Pre-Construction Blyth Offshore Demonstrator Project - Array 2 Blyth Offshore Demonstrator Project - Array 2
Pre-Construction East Anglia ONE East Anglia ONE
Pre-Construction Hornsea Project One Hornsea Project One
Pre-Construction Hywind Scotland Pilot Park Hywind Scotland Pilot Park
Pre-Construction Walney Extension Walney Extension
Consent Authorised Blyth Offshore Demonstrator Project - Array 3A & 4 Blyth Offshore Demonstrator Project - Array 3A & 4
Consent Authorised Dogger Bank - Creyke Beck A Dogger Bank - Creyke Beck A
Consent Authorised Dogger Bank - Creyke Beck B Dogger Bank - Creyke Beck B
Consent Authorised Dogger Bank - Teesside A Dogger Bank - Teesside A
Consent Authorised Dogger Bank - Teesside B Dogger Bank - Teesside B
Consent Authorised Dounreay Trì Dounreay Trì
123
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at http://www.4coffshore.com/windfarms/windfarms.aspx?windfarmID=uk0v.