Donghai Bridge 100 MW offshore wind power demonstration project
102 MW Fully Commissioned China
Updated weekly to include the latest news, your feedback and other data.
38 Countries, 1317 Windfarms, 9090 Stakeholders, 4282 Events, 824 Vessels, 153 Turbines NEW, 42 Ports,
Filter Projects by Country
1234
StatusName
Fully Commissioned Chenjiagang Xiangshui Project (Onshore)
Fully Commissioned Dafeng (Shanghai Electric) Intertidal Demonstration Turbine
Fully Commissioned DDHI Composite Bucket Foundation Test Project
Fully Commissioned Donghai Bridge 100 MW offshore wind power demonstration project
Fully Commissioned Guodian United Power 6MW Prototype
Fully Commissioned Huaneng Rongcheng Power Prototype Demonstration Project
Fully Commissioned Jiangsu Rudong 150MW Offshore (Intertidal) Demonstration Wind Farm - extension
Fully Commissioned Jiangsu Rudong 150MW Offshore (Intertidal) Demonstration Wind Farm - phase I
Fully Commissioned Jiangsu Rudong 150MW Offshore (Intertidal) Demonstration Wind Farm - phase II
Fully Commissioned Longyuan Rudong Intertidal Trial Wind Farm
Fully Commissioned Suizhong 36-1 Oil Field
Fully Commissioned Xiangshui Intertidal Pilot Project - Goldwind - GW 100/2500
Fully Commissioned Xiangshui Intertidal Pilot Project - Shanghai Electric - W2000M-93-70
Fully Commissioned Xiangshui Intertidal Pilot Project- Shanghai Electric - SEC2000
Partial Generation/Under Construction Datang Laizhou Wind Farm Phase III
Under Construction Donghai Bridge Offshore Wind Farm Phase II (Extension) project
Under Construction Guangdong Yudean - Xuwen offshore wind power demonstration project
Under Construction Huaneng Rongcheng Power Project
Under Construction Lingang offshore wind farm demonstration project (phase 1)
Under Construction Longyuan Rudong Intertidal Trial Wind Farm -Extension
Under Construction Rudong Zhongshui ( intertidal ) 100MW demonstration project - phase 1
Under Construction Xiangshui Intertidal Pilot Project - Extension
Consent Authorised Beibu Gulf offshore wind power project
Consent Authorised Binhai Offshore Concession Project
Consent Authorised China Guangdong Nuclear Power Daishan 4 offshore wind farm
Consent Authorised CNOOC Weihai - phase I
Consent Authorised CNOOC Weihai - Roncheng - Northern Block
Consent Authorised CPI Jiangsu Dafeng offshore wind farm demonstration project (200MW intertidal)
Consent Authorised Dafeng Intertidal Concession Project
Consent Authorised Dagang Intertidal
Consent Authorised Dongtai wind farm - phase 3
Consent Authorised Fuqing Haitan Strait Intertidal wind farm
Consent Authorised Guangdong Yudean Zhanjiang Wailuo Offshore wind farm
Consent Authorised Hainan Lingao Offshore Pilot project
Consent Authorised HEC Offshore Wind Farm
Consent Authorised Hong Kong Offshore Wind Farm
Consent Authorised Huadian Yuhuan Offshore Wind Farm - Phase 1
Consent Authorised Huaneng Dafeng Intertidal C4 Wind Power Demonstration Project
Consent Authorised Jiangsu Dongtai Intertidal Zone Wind Farm Concession Project
Consent Authorised Laoting Yuetuo Island Offshore Windfarm 300MW Demonstration Project
1234
Featured Ports
Featured Port
BOW Terminal Vlissingen, The Netherlands Image of <%# Eval("PortName") %> Maximum Trenched Depth: 13 m
Entrance Width: 250 m
Spring Tidal Range: 5 m
Quay Length: 1400 m
Quay Loading Capability: 15 tonnes/m2
Land for Development: 7 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 3321.2000 MW
2.  Denmark - 871.4800 MW
3.  China - 559.5000 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 3084.8000 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1401.1200 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 434.5000 MW
Loading Map
Equipment Available for Charter
Statistics for Donghai Bridge 100 MW offshore wind power demonstration project
General Information Name Donghai Bridge 100 MW offshore wind power demonstration project correct
Other names East China Sea Bridge Offshore Wind Farm Phase I correct
Country name China correct
Region Shanghai correct
Comments correct
Round (or category) correct
Development status Fully Commissioned correct
Comments on the status Generating Power Since June 2010 correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 102 MW correct
Turbine Model SL 3000/90 (Sinovel) correct
Turbine Capacity 3 MW correct
Number of Turbines 34 correct
Total Turbine Height 136 m correct
Hub Height 91.00 m correct
Rotor Diameter 90 m correct
Foundation Grounded: High-Rise Pile Cap correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost USD(mill) 102.00 correct
Location & Environment Sea name East China Sea correct
Centre latitude 30.770° correct
Centre longitude 121.994° correct
Area 14 km2 correct
Depth range (Chart Datum) 7 m - 7 m correct
Depth range stated by developer 10 m - 10 m correct
Distance From Shore (reported) 8 km correct
Distance From Shore (computed from centre) 16 km correct
Ports Installation base correct
Ops and maintenance correct
Grid Converter platforms None correct
Offshore transformers None correct
Grid connection point Donghai Bridge onshore substation (35/110kV) correct
Cable landing point correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 1 correct
Average length per cable 78 km correct
Transmission type (e.g. HVAC) MVAC correct
Nominal voltage correct
Maximum voltage correct
Power rating correct
Number of cores 3 correct
Conductor type correct
Section 70-300 mm2 correct
Insulation correct
Number fibre optics correct
Minimum bend radius (MBR) correct
Burial depth correct
Comments 35 kV turbine output transmitted by an increasing-thickness 35kV cable to the onshore substation where it is stepped up to 110kV. correct
Onshore Cables (new) Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length correct
Estimated cable length In purchased database
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 35 kV correct
Maximum voltage correct
Burial depth correct
Number of cores 3 correct
Conductor type correct
Section 150 mm2 correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 57033 correct
CO2 reduced per year 115264 tonnes correct
SO2 reduced per year 2681 tonnes correct
Expected life 26.0 years correct
Other Website correct

Events on Donghai Bridge 100 MW offshore wind power demonstration project
DateTypeDescriptionSourceCorrect
06-Jul-2010
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Operation - Generating Power Visit correct
06-Jul-2010
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
The wind farm started to transmit power to the grid. Visit correct
27-Feb-2010
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Last turbine was installed. Other correct
04-Sep-2009
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
At 21:15 on September 4th, the first batch of 3 wind turbines were formally put into operation. Other correct
Jul-2008
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Construction Launched Visit correct
24-Mar-2008
Event Type: Planning - Other Approval                                                                                                                                                                                                                                      Planning - Other Approval
EIA Approved Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.
Comments on Donghai Bridge 100 MW offshore wind power demonstration project offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required

Added: Fri, 29 Jul 2011 22:46:00 GMT
It would be most interesting to know the amount of energy produced per year. The information that you give in terms of number of homes powered is not informative, since one does not know what is the average consumption of a home. Best regards, Jacques Treiner
jtreiner@orange.fr