Donghai Bridge 100 MW offshore wind power demonstration project
102 MW Fully Commissioned China

"The database provides a great opportunity for market research and awareness."

Leo Hambro, Tidal Transit Limited

More Windfarms
Filter :
1234
StatusName
Fully Commissioned Dafeng (Shanghai Electric) Intertidal Demonstration Turbine
Fully Commissioned Datang Fujian XEMC Test Turbine(Nearshore)
Fully Commissioned DDHI Composite Bucket Foundation Test Project
Fully Commissioned Donghai Bridge 100 MW offshore wind power demonstration project
Fully Commissioned Guodian United Power 6MW Prototype
Fully Commissioned Huaneng Rongcheng Power Prototype Demonstration Project
Fully Commissioned Jiangsu Rudong 150MW Offshore (Intertidal) Demonstration Wind Farm - extension
Fully Commissioned Jiangsu Rudong 150MW Offshore (Intertidal) Demonstration Wind Farm - phase I
Fully Commissioned Jiangsu Rudong 150MW Offshore (Intertidal) Demonstration Wind Farm - phase II
Fully Commissioned Longyuan Rudong Intertidal Trial Wind Farm
Fully Commissioned Suizhong 36-1 Oil Field
Fully Commissioned Xiangshui Intertidal Pilot Project - Goldwind - GW 100/2500
Fully Commissioned Xiangshui Intertidal Pilot Project - Shanghai Electric - W2000M-93-70
Fully Commissioned Xiangshui Intertidal Pilot Project- Shanghai Electric - SEC2000
Partial Generation/Under Construction Datang Laizhou Wind Farm Phase III
Partial Generation/Under Construction Xiangshui Intertidal Pilot Project - Extension
Under Construction Binhai Offshore Concession Project
Under Construction Changxing Floating Modular Foundation Demonstration Project
Under Construction Dafeng Intertidal Concession Project
Under Construction Donghai Bridge Offshore Wind Farm Phase II (Extension) project
Under Construction Guangdong Yudean - Xuwen offshore wind power demonstration project
Under Construction Huaneng Rongcheng Power Project
Under Construction Jiangsu Dongtai Offshore Wind Farm Concession Project
Under Construction Lingang offshore wind farm demonstration project (phase 1)
Under Construction Longyuan Rudong Intertidal Trial Wind Farm -Extension
Under Construction Rudong Zhong Guang He offshore demonstration project
Under Construction Rudong Zhongshui ( intertidal ) 100MW demonstration project - phase 1
Under Construction Zhuhai Guishan Offshore Wind Farm Demonstration Project
Consent Authorised Beibu Gulf offshore wind power project
Consent Authorised China Guangdong Nuclear Power Daishan 4 offshore wind farm
Consent Authorised CNOOC Weihai - phase I
Consent Authorised CNOOC Weihai - Roncheng - Northern Block
Consent Authorised CPI Jiangsu Dafeng offshore wind farm demonstration project (200MW intertidal)
Consent Authorised Dagang Intertidal
Consent Authorised Fengxian
Consent Authorised Fengxian Large Scale
Consent Authorised Fuqing Haitan Strait Intertidal wind farm
Consent Authorised Guangdong Yudean Zhanjiang Wailuo Offshore wind farm
Consent Authorised Guodian Zhoushan Putuo #6 Offshore Wind Farm
Consent Authorised Hainan Lingao Offshore Pilot project
1234
map not available
Developers/Owners/Operators
RoleOrganisation 
Developer
Shanghai Donghai Wind Power Generation Company Ltd (上海东海风力发电有限公司)
correct
Operator
Shanghai Donghai Wind Power Generation Company Ltd (上海东海风力发电有限公司)
correct
Owner correct
Owner
Shanghai Green Energy Co., Ltd
correct
Owner correct
Owner correct
Project Details for Donghai Bridge 100 MW offshore wind power demonstration project
General Information Name Donghai Bridge 100 MW offshore wind power demonstration project correct
Other names East China Sea Bridge Offshore Wind Farm Phase I correct
Country name China correct
Region Shanghai correct
Comments correct
Round (or category) correct
Development status Fully Commissioned correct
Comments on the status Generating Power Since June 2010 correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 102 MW correct
Turbine Model SL 3000/90 (Sinovel) correct
Turbine Capacity 3 MW correct
Number of Turbines 34 correct
Total Turbine Height 136 m correct
Hub Height 91.00 m correct
Rotor Diameter 90 m correct
Foundation Grounded: High-Rise Pile Cap correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost CNY(mill) 2360.00 correct
Location & Environment Sea name East China Sea correct
Centre latitude 30.770° correct
Centre longitude 121.994° correct
Area 14 km2 correct
Depth range (Chart Datum) 7 m - 7 m correct
Depth range stated by developer 10 m - 10 m correct
Distance From Shore (reported) 8 km correct
Distance From Shore (computed from centre) 16 km correct
Ports Installation base correct
Ops and maintenance correct
Grid Converter platforms None correct
Offshore transformers None correct
Grid connection point Donghai Bridge onshore substation (35/110kV) correct
Cable landing point Nanhui Point correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables correct
Average length per cable correct
Transmission type (e.g. HVAC) MVAC correct
Nominal voltage correct
Maximum voltage correct
Power rating correct
Number of cores 3 correct
Conductor type correct
Section Area 70-300 mm2 correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments 35 kV turbine output transmitted by an increasing-thickness 35kV cable to the onshore substation where it is stepped up to 110kV. correct
Onshore Cables Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 35 kV correct
Maximum voltage correct
Burial depth correct
Number of cores 3 correct
Conductor type correct
Section 150 mm2 correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 57033 correct
CO2 reduced per year 115264 tonnes correct
SO2 reduced per year 2681 tonnes correct
Expected life 26.0 years correct
Other Website correct