EnBW Baltic 1
48.3 MW Fully Commissioned Germany

"The database has become an invaluable tool with regard to business planning and the regular updates from the 4C Offshore team on the project specifics ensure that, as a tier 1 supplier, we remain well informed and able to react to market developments."

Darren Taylor, NKT Cables

  • All Projects
  • Followed Projects

Latest Windfarm News
SMM bags double order
TradeWinds
In a second deal Sembmarine SLP Ltd, which is 70% owned by Sembcorp Marine, has won the contract to design and build the offshore substation platform for the UK's Dudgeon Offshore Wind Farm. The contract has been granted by Siemens Transmission ...
Source: news.google.com
20/10/2014 03:39:27

Massachusetts cleantech incubators join forces with OrbisEnergy
Business Weekly
OrbisEnergy and WAB, the Wind Energy Agency for north-west Germany, signed a Memorandum of Understanding to develop a collaborative working relationship for North Sea offshore wind during a visit of a German delegation to the east coast.
Source: news.google.com
18/10/2014 17:31:01

Let's do offshore wind power the right way!
Summit County Citizens Voice
FRISCO — Many of the conflicts between energy development and wildlife protection developed because there wasn't enough upfront planning. Researchers with the University of Maryland say similar issues relating to offshore wind energy can be minimized ...
Source: news.google.com
18/10/2014 15:08:20

Five weeks to share views on Triton Knoll
East Lindsey Target
RWE Innogy UK's project manager for Triton Knoll, Jacob Hain, said: "This five week consultation is a further opportunity for people to discuss the design of the proposed electrical system that will connect the Triton Knoll Offshore Wind Farm to the national grid.
Source: news.google.com
18/10/2014 06:41:40

SeaRoc and HSEQ Experts join forces
Maritime Journal
SeaRoc and HSEQ Experts have highly complementary competencies and capabilities, with both organisations having significant experience of offshore wind construction projects. The initial focus of the collaboration will be to provide offshore wind farm ...
Source: news.google.com
17/10/2014 14:35:32

Dudgeon Offshore Wind awards Charter for WTG transport and installation
Your Renewable News (press release)
Dudgeon Offshore Wind Limited, which holds the licenses and consents to enable it to construct the Dudgeon offshore wind farm, is owned by two Norwegian companies, Statoil and Statkraft, and Abu Dhabi's renewable energy company, Masdar. Statoil holds ...
Source: news.google.com
17/10/2014 13:39:38

Go ahead given to offshore wind farm off coast of Angus
Montrose Review
The Scottish Government has given consent to the massive Inch Cape wind farm project off the Angus coastline. Friday's decision also gave consent to three other North Sea locations, two off Angus and one off the Fife coast, and the government predicts the ...
Source: news.google.com
17/10/2014 10:00:15




4C Offshore Ltd. has achieved certification to the ISO 9001, ISO 14001 and OHSAS 18001 standards for quality, environmental, and health & safety management.
map not available
Developers/Owners/Operators
RoleOrganisation 
Developer correct
Operator
correct
Owner correct
Owner correct
Owner
electricity plant Mittelbaden AG & Co. KG
correct
Owner correct
Owner
Ostwürttemberg DonauRies EnBW AG
correct
Owner correct
Owner
energy and water supply Bruchsal 
correct
Owner correct
Owner correct
Owner
FairEnergie GmbH
correct
Owner
Stadtwerke Düsseldorf AG 
correct
Owner correct
Owner
Stadtwerke Ettlingen GmbH 
correct
Owner
Stadtwerke Fellbach GmbH 
correct
Owner correct
Owner
Stadtwerke Schwäbisch Gmünd GmbH 
correct
Owner
Stadtwerke Sindelfingen GmbH 
correct
Owner
Stadtwerke Sinsheim supply GmbH & Co. KG 
correct
Owner correct
Owner
ZEAG Energie AG
correct
Project Details for EnBW Baltic 1
General Information Name EnBW Baltic 1 correct
Other names Baltic I correct
Country name Germany correct
Region 12nm zone (Mecklenburg-Vorpommern) correct
Comments correct
Round (or category) correct
Development status Fully Commissioned correct
Comments on the status correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 48.3 MW correct
Turbine Model SWT-2.3-93 (Siemens) correct
Turbine Capacity 2.3 MW correct
Number of Turbines 21 correct
Total Turbine Height 113.5 m correct
Hub Height 67.00 m correct
Rotor Diameter 93 m correct
Foundation Grounded: Monopile correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost EUR(mill) 200.00 correct
Location & Environment Sea name Baltic Sea correct
Centre latitude 54.609° correct
Centre longitude 12.651° correct
Area 7 km2 correct
Depth range (Chart Datum) 16 m - 19 m correct
Depth range stated by developer 16 m - 19 m correct
Distance From Shore (reported) 16 km correct
Distance From Shore (computed from centre) 17.1 km correct
Ports Installation base Nyborg, Denmark correct
Ops and maintenance Barhöft correct
Grid Converter platforms None correct
Offshore transformers EnBW Baltic 1 Substation correct
Grid connection point Bentwisch correct
Cable landing point Markgrafenheide, near Rostock correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 2 correct
Average length per cable 61 km correct
Transmission type (e.g. HVAC) HVAC correct
Nominal voltage 150 kV correct
Maximum voltage correct
Power rating correct
Number of cores 3 correct
Conductor type Cu correct
Section Area 1200 mm2 correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth 1.5 m correct
Comments The second export cable will be added when EnBW Baltic 2 is connected to EnBW Baltic 1. The original Baltic 1 link has only 1 export cable. correct
Onshore Cables Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length 21 km correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 30 kV correct
Maximum voltage correct
Burial depth correct
Number of cores 3 correct
Conductor type Cu correct
Section 120/240 mm2 correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 31508 correct
CO2 reduced per year 63678 tonnes correct
SO2 reduced per year 1481 tonnes correct
Expected life 20.0 years correct
Other Website Visit correct