Latest event on EnBW Baltic 1

The five-year OEM service agreement will expire around this date. Read more

Latest Update: 30 April 2016

You can help keep this an open resource by submitting new information. Simply click on the correct pencil icon.
Developers/Owners/Operators Database in Excel | Add your Organisation
Developer correct
Owner correct
electricity plant Mittelbaden AG & Co. KG
Owner correct
Ostwürttemberg DonauRies EnBW AG
Owner correct
energy and water supply Bruchsal 
Owner correct
Owner correct
FairEnergie GmbH
Stadtwerke Düsseldorf AG 
Owner correct
Stadtwerke Ettlingen GmbH 
Stadtwerke Fellbach GmbH 
Owner correct
Stadtwerke Schwäbisch Gmünd GmbH 
Stadtwerke Sindelfingen GmbH
Stadtwerke Sinsheim supply GmbH & Co. KG 
Owner correct
ZEAG Energie AG
EnBW Energie Baden-Württemberg AG
Project Details for EnBW Baltic 1
General Information Name EnBW Baltic 1 correct
Other names Baltic I correct
Country name Germany correct
Region 12nm zone (Mecklenburg-Vorpommern) correct
Comments correct
Round (or category) correct
Development status Fully Commissioned correct
Power & Turbines Project capacity 48.3 MW correct
Turbine model SWT-2.3-93 (Siemens) correct
Turbine capacity 2.3 MW correct
Number of turbines 21 correct
Total turbine height 113.5 m correct
Hub height 67.00 m correct
Rotor diameter 93 m correct
Foundation Grounded: Monopile correct
Windspeed 10 year mean wind speed (2000-2009) Available online now
Costs Stated project cost EUR(mill) 200.00 correct
Location & Environment Sea name Baltic Sea correct
Centre latitude 54.610° correct
Centre longitude 12.651° correct
Area 7 km2 correct
Depth range (Chart Datum) 16 m - 19 m correct
Depth range stated by developer 16 m - 19 m correct
Distance from shore (reported) 16 km correct
Distance from shore (computed from centre) 17.1 km correct
Ports Installation base Nyborg, Denmark correct
Ops and maintenance Barhöft, Rostock correct
Grid Converter/Collector platforms None correct
Offshore transformers EnBW Baltic 1 Substation correct
Grid connection point Bentwisch correct
Cable landing point Markgrafenheide, near Rostock correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of export cables 2 correct
Average length per cable 61 km correct
Transmission type (e.g. HVAC) correct
Nominal voltage 150 kV correct
Maximum voltage correct
Power rating correct
Number of cores 3 correct
Conductor type correct
Section area 1200 mm2 correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth 1.5 m correct
Comments The second export cable will be added when EnBW Baltic 2 is connected to EnBW Baltic 1. The original Baltic 1 link has only 1 export cable. correct
Onshore Cables Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length 24.5 km correct
Estimated cable length Login
Transmission type (e.g. MVAC) correct
Nominal voltage 30 kV correct
Maximum voltage correct
Burial depth correct
Number of cores 3 correct
Conductor type correct
Section 120/240 mm2 correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 34209 correct
CO2 reduced per year 69136 tonnes correct
SO2 reduced per year 1608 tonnes correct
Expected life 20.0 years correct
Other Website Visit correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.


More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
Decommissioned Hooksiel Hooksiel
Fully Commissioned Alpha Ventus Alpha Ventus
Fully Commissioned Amrumbank West Amrumbank West
Fully Commissioned BARD Offshore 1 BARD Offshore 1
Fully Commissioned Borkum Riffgrund 1 Borkum Riffgrund 1
Fully Commissioned Breitling Breitling
Fully Commissioned Butendiek Butendiek
Fully Commissioned DanTysk DanTysk
Fully Commissioned EnBW Baltic 1 EnBW Baltic 1
Fully Commissioned EnBW Baltic 2 EnBW Baltic 2
Fully Commissioned ENOVA Offshore Project Ems Emden ENOVA Offshore Project Ems Emden
Fully Commissioned Global Tech I Global Tech I
Fully Commissioned Gode Wind 1 and 2 Gode Wind 1 and 2
Fully Commissioned Meerwind Süd/Ost Meerwind Süd/Ost
Fully Commissioned Nordergründe Nordergründe
Fully Commissioned Nordsee One Nordsee One
Fully Commissioned Nordsee Ost Nordsee Ost
Fully Commissioned Riffgat Riffgat
Fully Commissioned Sandbank Sandbank
Fully Commissioned Trianel Windpark Borkum I Trianel Windpark Borkum I
Fully Commissioned Veja Mate Veja Mate
Fully Commissioned Wikinger Wikinger
Under Construction Arkona Arkona
Under Construction Borkum Riffgrund 2 Borkum Riffgrund 2
Under Construction Merkur Merkur
Pre-Construction Deutsche Bucht Deutsche Bucht
Pre-Construction GICON Schwimmendes Offshore Fundament (SOF) Pilot GICON Schwimmendes Offshore Fundament (SOF) Pilot
Pre-Construction Hohe See Hohe See
Pre-Construction OWP Albatros OWP Albatros
Pre-Construction Trianel Windpark Borkum II Trianel Windpark Borkum II
Consent Authorised Arcadis Ost 1 Arcadis Ost 1
Consent Authorised Borkum Riffgrund West I Borkum Riffgrund West I
Consent Authorised Delta Nordsee 1 Delta Nordsee 1
Consent Authorised Delta Nordsee 2 Delta Nordsee 2
Consent Authorised Deutsche Bucht Pilot Park Deutsche Bucht Pilot Park
Consent Authorised EnBW He Dreiht EnBW He Dreiht
Consent Authorised Gode Wind 3 Gode Wind 3
Consent Authorised Gode Wind 4 Gode Wind 4
Consent Authorised Nördlicher Grund Nördlicher Grund
Consent Authorised Nordsee Three Nordsee Three
Consent Authorised Nordsee Two Nordsee Two
Consent Authorised OWP West OWP West
Consent Authorised Sandbank Plus Sandbank Plus
Consent Application Submitted Adlergrund 500 Adlergrund 500
Consent Application Submitted Adlergrund GAP Adlergrund GAP
Consent Application Submitted Baltic Eagle Baltic Eagle
Consent Application Submitted Borkum Riffgrund West 2 Borkum Riffgrund West 2
Consent Application Submitted Gennaker Gennaker
Consent Application Submitted Kaskasi II Kaskasi II
Consent Application Submitted Ostseeschatz Ostseeschatz
Please Login to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.


Follow us on social media and stay informed.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at