Global Tech I
400 MW Consent Authorised Germany
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Able Humber Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 11 m
Entrance Width: 840 m
Spring Tidal Range: 6.4 m
Quay Length: 1279 m
Quay Loading Capability: 20 tonnes/m2
Land for Development: 647 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
VesselRoleOrganisationDescriptionCorrect
Cable Innovator Vessel-Array Cable Installation(burial) Global Marine Systems Ltd The Cable Innovator will bury the cables. As part of Global Marine Systems Ltd/Norddeutsche Seekabelwerke GmbH (NSW) JV, for - Client: Global Tech I Offshore Wind GmbH More... correct
CS Sovereign Vessel-Array Cable Installation(cable lay) Global Marine Systems Ltd Period: 31-Dec-2012
The CS Sovereign will lay the cables. As part of Global Marine Systems Ltd/Norddeutsche Seekabelwerke GmbH (NSW) JV, for - Client: Global Tech I Offshore Wind GmbH More...
correct
Thor Vessel-Foundation Installation(turbine) Hochtief Construction AG - Civil Engineering and Marine Works (CEM) Period: Jul-2012
Installation of the 80 tripod foundations - Client: Hochtief Construction AG - Civil Engineering and Marine Works More...
correct
INNOVATION Vessel-Turbine Installation HGO Infra Sea Solutions(formerly Beluga Hochtief Offshore GmbH & Co. KG) Period: Jul-2012
The MV Innovation will be used to install the foundations and turbines. The cost reflects the MV Innovation and the Thor's involvement. More...
correct
Thor Vessel-Turbine Installation Hochtief Construction AG - Civil Engineering and Marine Works (CEM) Period: Jul-2012
The Thor will install the turbines and foundations. The cost reflects the MV Innovation and the Thor's involvement.
correct
Vessels & Equipment Available for Immediate Charter
Statistics for Global Tech I
Wind Farm Name Global Tech I correct
CountryGermany
Region Exclusive Economic Zone (BorWin) correct
SeaName North Sea correct
Centre Latitude 54.507°
Centre Longitude 6.364°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Consent Authorised correct
Comments on the Status 
Status Documentation This is the Approval Document
Capacity 400 MW correct
Turbine Capacity 5 MW correct
Number of Turbines 80 correct
Turbine Model M5000-116 (Areva Wind) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 116 m correct
Total Turbine Height 148 m correct
Hub Height 90 m correct
Other comments correct
Foundation Grounded: Tripod correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 43 km2
Water Depth Min (Chart Datum) 38 m correct
Water Depth Max (Chart Datum) 41 m correct
Depth range stated by developer 39 m - 41 m correct
Distance From Shore (reported) 115 km correct
Distance From Shore (computed from wind farm centre) 109.4 km
Export Cable Length 30 km correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 155 kV correct
Infield Cable Capacity 33 kV correct
Number of Export Cables 2 correct
Export Cable Type correct
Cable Description 2 x 30km cables will conect Global Tech One substation to BorWin Beta correct
Number of Offshore Substations 1 correct
Grid Connection Point BorWin2 (beta) offshore converter platform - Diele substation (Onshore) correct
Cable Landing Point Hilgenriedersiel correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost EUR(mill) 1000.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base Bremerhaven correct
Port For Ops and Maintenance correct
Number of homes powered annually: 223,660 homes
CO2 Reduced Per Year 452,016 tonnes
SO2 Reduced Per Year 10,512 tonnes
Website Visit correct

Events on Global Tech I
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Wind farm to become fully operational in Subscribe. With the delays in building the transmission lines this could be delayed until Subscribe. Subscribe correct
31-Dec-2012
Event Type: Planning - Other Approval                                                                                                                                                                                                                                      Planning - Other Approval
Construction start deadline according to BSH extension Visit correct
Jul-2012
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
Hochtief estimate they will begin foundation installation in mid-2012. Visit correct
05-Apr-2012
Event Type: Planning - Other Approval                                                                                                                                                                                                                                      Planning - Other Approval
The Federal Maritime and Hydrographic Agency (BSH) has approved the converter platform "BorWin Beta" and the HVDC export cables associated with it. Visit correct
31-Oct-2011
Event Type: Planning - Financial Close                                                                                                                                                                                                                                     Planning - Financial Close
More than a dozen commercial banks were involved in the financing of the project. Visit correct
24-May-2006
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Consent Authorised Visit correct
09-Jul-2005
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
Date of application Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Global Tech I offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Global Tech I More weather tools available on 4C Interactive Map. More weather forecast tools