Horns Rev 2

209.3 MW Fully Commissioned Denmark

"The 4C database is much more comprehensive than we expected – it is easily accessible, updated regularly and contains a wealth of relevant up to date information. This has been a very good investment for us and we recommend it as a must for the Wind Farm Vessel Supply Chain."

David Symon, Humber Work Boats Ltd

  • All Projects
  • Followed Projects
Please LogIn to follow projects
Search for Projects or Companies

Latest Windfarm News


map not available
Developers/Owners/Operators
Project Details for Horns Rev 2
General Information Name Horns Rev 2 correct
Other names correct
Country name Denmark correct
Region Blåvandshuk correct
Comments correct
Round (or category) Tender (DK) correct
Development status Fully Commissioned correct
Comments on the status correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 209.3 MW correct
Turbine Model SWT-2.3-93 (Siemens) correct
Turbine Capacity 2.3 MW correct
Number of Turbines 91 correct
Total Turbine Height 114.5 m correct
Hub Height 68.00 m correct
Rotor Diameter 93 m correct
Foundation Grounded: Monopile correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost EUR(mill) 448.00 correct
Location & Environment Sea name North Sea correct
Centre latitude 55.600° correct
Centre longitude 7.582° correct
Area 33 km2 correct
Depth range (Chart Datum) 9 m - 17 m correct
Depth range stated by developer 9 m - 17 m correct
Distance From Shore (reported) 31.7 km correct
Distance From Shore (computed from centre) 32.6 km correct
Ports Installation base Esbjerg correct
Ops and maintenance Esbjerg correct
Grid Converter platforms None correct
Offshore transformers Horns Rev 2 Substation correct
Grid connection point Endrup correct
Cable landing point Blåbjerg correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 1 correct
Average length per cable 42 km correct
Transmission type (e.g. HVAC) HVAC correct
Nominal voltage 150 kV correct
Maximum voltage 170 kV correct
Power rating correct
Number of cores 3 correct
Conductor type Cu correct
Section Area 800 mm2 correct
Insulation XLPE correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth 1 m correct
Comments correct
Onshore Cables Number of onshore cables 3 correct
Average length per cable 58 km correct
Comments 150kV, 1200mm2 Al laid in trefoil formation, buried up to 1.2m. cable screens cross-bonded. Cables were supplied by ABB. correct
Array Cables Array cable length 70 km correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 33 kV correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation XLPE correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 148238 correct
CO2 reduced per year 299589 tonnes correct
SO2 reduced per year 6967 tonnes correct
Expected life correct
Other Website Visit correct
worried