Horns Rev 2
209.3 MW
Updated weekly to include the latest news, your feedback and other data.
38
Countries,
1325
Windfarms
,
9264
Stakeholders,
4395
Events,
844
Vessels
,
160
Turbines
NEW
,
42
Ports
,
Subscribe!
Filter Projects by Country
Albania
Australia
Azerbaijan
Bangladesh
Belgium
Brazil
Canada
China
Croatia
Denmark
Estonia
Finland
France
Germany
Greece
India
Ireland
Italy
Japan
Latvia
Lithuania
Maldives
Malta
Netherlands
Norway
Poland
Portugal
Romania
Russia
South Korea
Spain
Sri Lanka
Sweden
Taiwan
Tunisia
United Kingdom
United States
Vietnam
1
2
Status
Name
Avedøre Holme
Frederikshavn
Horns Rev 1
Horns Rev 2
Middelgrunden
Nysted
Poseidon
Rødsand 2
Rønland
Samsø
Sprogø
Tunø Knob
Vindeby
Anholt
NearshoreLAB
DanTysk DK
Horns Rev 3
Kriegers Flak
Mejlflak
Nissum Bredning
Pilot Projects
Rønland III
Rønne Bakke
Bornholm
Horns Rev A HR5
Horns Rev B HR6
Horns Rev B HR7
Horns Rev Reserved Area
Jammerbugt A J3
Jammerbugt A J4
Jammerbugt B J1
Jammerbugt B J2
Jammerbugt Reserved Area
Kriegers Flak B K1
Kriegers Flak Reserved Area
Ringkøbing Fjord A RK1
Ringkøbing Fjord A RK2
Ringkøbing Fjord B RK3
Ringkøbing Fjord B RK4
Ringkøbing Fjord C RK5
1
2
Featured Port
Aalborg Port, Denmark
Maximum Trenched Depth: 9.3 m
Entrance Width: 110 m
Spring Tidal Range: 0.3 m
Quay Length: 200 m
Quay Loading Capability: 42 tonnes/m
2
Land for Development: 300 ha
More details...
Offshore Wind Ports
Aalborg Port
Able Humber Port
Able Middlesbrough Port
Able Seaton Port
BOW Terminal Vlissingen
EastPort UK
Great Yarmouth - Fendercare Marine Equipment & Lifting Services
Harwich Navyard
Lyness - Fendercare Marine
Newhaven - Fendercare Marine
Port of Wilhelmshaven
Rebo terminal, port of Oostende
Rønne Havn
Vlissingen - Verbrugge Terminals
More ports...
Who's Generating Power?
1.
United Kingdom
-
3321.2000 MW
2.
Denmark
-
871.4800 MW
3.
China
-
559.5000 MW
More...
Whose Turbines are Generating?
1.
Siemens Wind Power A/S (Siemens AG)
-
3084.8000 MW
2.
Vestas Offshore A/S (Vestas Wind Systems A/S)
-
1401.1200 MW
3.
REpower Systems AG (Suzlon Energy Limited)
-
434.5000 MW
Subscribe!
This is the 1st latest news item.
This is the 2nd latest news item.
This is the 3rd latest news item.
This is the 4th latest news item.
Developers/Owners/Operators
Database as Excel
|
Add Your Organisation
|
Check Your 4C Entries
Role
Organisation
Description
Developer
DONG Energy Horns Rev 2 A/S
(DONG Energy)
Company 100% owned by DONG Energy
Operator
DONG Energy Horns Rev 2 A/S
(DONG Energy)
Company 100% owned by DONG Energy
Owner
DONG Energy
100% stake
Value:
Subscribe
Percentage:
Subscribe
Click here to view the Supply Chain!
Click here to view all Vessels!
Equipment Available for Charter
Statistics for Horns Rev 2
Database in Excel
General Information
Name
Horns Rev 2
Other names
Country name
Denmark
Region
Blåvandshuk
Comments
Round (or category)
Tender (DK)
Development status
Fully Commissioned
Comments on the status
Power & Turbines
Notice any Errors?
You can keep this an open resource by submitting corrections!
Project Capacity
209.3 MW
Turbine Model
SWT-2.3-93 (Siemens)
Turbine Capacity
2.3 MW
Number of Turbines
91
Total Turbine Height
114.5 m
Hub Height
68.00 m
Rotor Diameter
93 m
Foundation
Grounded: Monopile
Download Database for Excel
Windspeed
10 Year Mean Wind Speed (2000-2009)
Available online now
Detailed wind speed data
6 hr/day/month historic data
Costs
Stated Project Cost
EUR(mill) 448.00
Location & Environment
Sea name
North Sea
Centre latitude
55.600°
Centre longitude
7.582°
Area
33 km
2
Depth range (Chart Datum)
9 m - 17 m
Depth range stated by developer
9 m - 17 m
Distance From Shore (reported)
31.7 km
Distance From Shore (computed from centre)
32.6 km
Ports
Installation base
Esbjerg
Ops and maintenance
Esbjerg
Grid
Converter platforms
None
Offshore transformers
Horns Rev 2 Substation
Grid connection point
Endrup
Cable landing point
Blåbjerg
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the
converters page
for planned converter stations and transmission cables.
The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables
1
Average length per cable
42 km
Transmission type (e.g. HVAC)
HVAC
Nominal voltage
150 kV
Maximum voltage
170 kV
Power rating
Number of cores
3
Conductor type
Cu
Section
800 mm
2
Insulation
XLPE
Number fibre optics
Minimum bend radius (MBR)
Burial depth
1 m
Comments
Onshore Cables
(new)
Number of onshore cables
3
Average length per cable
58 km
Comments
150kV, 1200mm2 Al laid in trefoil formation, buried up to 1.2m. cable screens cross-bonded. Cables were supplied by ABB.
Array Cables
Array cable length
70 km
Estimated cable length
In purchased database
Transmission type (e.g. MVAC)
MVAC
Nominal voltage
33 kV
Maximum voltage
Burial depth
Number of cores
Conductor type
Section
Insulation
XLPE
Power rating
Number of fibre optics
Minimum bend radius (MBR)
Comments
Benefits
Homes powered annually
117030
CO
2
reduced per year
236517 tonnes
SO
2
reduced per year
5500 tonnes
Expected life
Other
Website
Visit
Events on Horns Rev 2
Database in Excel
Date
Type
Description
Source
Correct
31-Jan-2010
Operation - Fully Commissioned
Project fully commissioned in January 2010
Other
17-Sep-2009
Operation - Generating Power
Generating power
Visit
Sep-2009
Installation - Turbine Installation
Final turbine installed - installation is now complete.
Visit
20-Mar-2009
Installation - Turbine Installation
First turbine installed.
Other
May-2008
Installation - Foundation Installation
Foundation installation started May 2008.
Visit
May-2008
Installation - Offshore Construction Starts
Offshore construction work started.
Visit
Mar-2007
Planning - Consent Authorised
Consent was granted in March 2007.
Visit
2007
Planning - Financial Close
Estimated year for financial close.
Visit
2005
Planning - Consent Application Submitted
Estimated date for planning consent submission.
Visit
19-May-2003
Planning - Financing Agreement
The Environmental Investment Bank (EIB) provided up to €134m of debt finance.
Visit
Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.
Comments on Horns Rev 2 offshore wind farm
Please note,
your comment will take 1 hour to appear
.
Your Name *
:
Web Site (optional)
:
http://
Comment *
:
* required
Added:
Thu, 02 Aug 2012 04:12:00 GMT
We are International Ship Sales-Purchase-Charter brokers, in business for over 36 years and operating out of our office here in St. John's, Newfoundland. We have the following units described below, which we feel, may be of interest to you. Please see attached information on the Canadian heavy-lift barge "Marine Link Explorer" with 2 x 214 mt derricks and the twin-screw 3,470 hp Canadian tug. I have more information and a series of photos on these units which I can send to you as attachments to following e-mail. Please advise if you would like to see it. We feel that you may have a need for this marine equipment for use in installation of offshore turbines. Please note that the Canadian owner of the heavy-lift barge & tug would like to get US$5 million for both en bloc but I understand that he might well consider an offer in the range of US$3.75 - $4.25 million, if the deal could be closed cleanly and quickly. While he would prefer to sell both en bloc, he might consider selling them seperately. Can guide on the price of the units seperately. Units are in Eastern Canada. Please advise if you have any interest in these units and I will send along addition information and series of photos, etc. Thank you, success and regards, John A. Andrews Fogo Boat Brokerage Neptune International Shipping Inc. 120 LeMarchant Road, P.O. Box 6211 (Station "C") St. John's, Newfoundland,> Canada. A1C 5X8 Tel (office): 1 (709) 754-1003 Tel (mobile): 1 (709) 727-9616 Facsimile: 1 (709) 754-1015
John Andrews
Added:
Wed, 29 Sep 2010 17:32:00 GMT
7 x 13, but what is the distance between towers and rows?
Stefano WRC
Added:
Thu, 19 Aug 2010 22:56:00 GMT
What is the layout of Horns Rev 2. Is it 9 x 10, or is it something else?
William E. Griswold
<< Newer Comments
Older Comments >>