Navacel shipped out the second load of tower segments for the Hywind project. Read more

Latest Update: 21 March 2017

Developers/Owners/Operators Database in Excel | Add Your Organisation
Project Details for Hywind Scotland Pilot Park Database in Excel
Name Hywind Scotland Pilot Park correct
Other names Hywind II, Hywind 2, Buchan Deep correct
Country name United Kingdom correct
Region Scotland, Grampian correct
Comments Statoil Wind Limited (SWL) has been awarded an Exclusivity Agreement by The Crown Estate (TCE) for the deployment of floating wind turbine gererator (WTG) units in an area known as the Buchan Deep which is an area of deep water (95 to 120 m) located approximately 25 km off the coast at Peterhead, north east Scotland just outside the 12 nm territorial water limit. tyjtj

The Exclusivity Area is split into a northern and a southern part by the Forties to Cruden Bay pipelines which pass through the Exclusivity Area from north east to south west. The Pilot Park will be located either to the north or south of these pipelines. Electricity generated from the Pilot Park will be exported onshore to the local grid network via a new export cable to Peterhead.

The WTG units will be positioned approximately 720 to 1,600m apart. The WTG units will be attached to the seabed by a three-point mooring spread. The anchor types currently under consideration are drag embedded (fluke or plate), torpedo, suction embedded plate anchors, suction anchors and gravity anchors. Three anchors (or possibly six ) will normally be required per WTG unit. The mooring lines are likely to be composed of combinations of wire and chains and possibly synthetic fibre rope, and may include the use of clump weights and/or buoyancy elements. The radius of the mooring systems extending out from each of the WTG Units will be between 600 to 1,200 m. The WTG Units will be connected by inter-array cables which may require anchoring in some locations.

In addition to the proposed AfL Area and associated onshore and offshore infrastructure, the Hywind Scotland Pilot Park Project will use a deep water inshore area, the location of which is still to be determined, to assemble the

WTG Units prior to installation. Once assembled, the WTG Units will be towed in an upright position from the assembly point to the Buchan Deep.

The maximum life of the park is 25 Years.

Average wind speed = 10.1 m/s
correct
Round (or category) Scottish Floating Demostration correct
Development status Pre-Construction correct
Comments on the status correct
Notice any Errors? You can keep this an open resource by submitting corrections!
Project capacity 30 MW correct
Turbine model SWT-6.0-154 (Siemens) correct
Turbine capacity 6 MW correct
Number of turbines 5 correct
Total turbine height 178 m correct
Hub height 101.00 m correct
Rotor diameter 154 m correct
Foundation Floating: Spar Floater (The spar floater measures 80m in length.) correct
10 year mean wind speed (2000-2009) Available online now
Stated project cost GBP(mill) 152.00 correct
Sea name North Sea, Northern North Sea (Cromarty) correct
Centre latitude 57.484° correct
Centre longitude -1.363° correct
Area 15 km2 correct
Depth range (Chart Datum) 96 m - 110 m correct
Depth range stated by developer 95 m - 120 m correct
Distance from shore (reported) 25 km correct
Distance from shore (computed from centre) 24.7 km correct
Installation base Stordbase correct
Ops and maintenance Peterhead, Great Yarmouth (Control Room) correct
Converter/Collector platforms None correct
Offshore transformers None correct
Grid connection point Peterhead Grange Substation correct
Cable landing point Peterhead correct
Number of export cables 1 correct
Average length per cable 27.5 km correct
Transmission type (e.g. HVAC) MVAC correct
Nominal voltage 33 kV correct
Maximum voltage 36 kV correct
Power rating correct
Number of cores correct
Conductor type correct
Section area correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments The static part of the cable is likely to be buried. correct
Number of onshore cables correct
Average length per cable 1.5 km correct
Comments correct
Array cable length 8.5 km correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 33 kV correct
Maximum voltage 36 kV correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments The array cables, which will not be buried, have a diameter of 169mm. correct
Homes powered annually 21248 correct
CO2 reduced per year 42942 tonnes correct
SO2 reduced per year 999 tonnes correct
Expected life 20.0 years correct
Website Visit correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
123
StatusName
Decommissioned Beatrice Demonstration Beatrice Demonstration
Decommissioned Blyth Blyth
Fully Commissioned Barrow Barrow
Fully Commissioned Burbo Bank Burbo Bank
Fully Commissioned Greater Gabbard Greater Gabbard
Fully Commissioned Gunfleet Sands Gunfleet Sands
Fully Commissioned Gunfleet Sands 3 - Demonstration Project Gunfleet Sands 3 - Demonstration Project
Fully Commissioned Gwynt y Môr Gwynt y Môr
Fully Commissioned Humber Gateway Humber Gateway
Fully Commissioned Hunterston Test Centre - Mitsubishi 7MW (onshore) Hunterston Test Centre - Mitsubishi 7MW (onshore)
Fully Commissioned Hunterston Test Centre - Siemens 6MW (onshore) Hunterston Test Centre - Siemens 6MW (onshore)
Fully Commissioned Hunterston Test Centre (onshore) Hunterston Test Centre (onshore)
Fully Commissioned Inner Dowsing Inner Dowsing
Fully Commissioned Kentish Flats Kentish Flats
Fully Commissioned Kentish Flats Extension Kentish Flats Extension
Fully Commissioned Levenmouth demonstration turbine Levenmouth demonstration turbine
Fully Commissioned Lincs Lincs
Fully Commissioned London Array London Array
Fully Commissioned Lynn Lynn
Fully Commissioned North Hoyle North Hoyle
Fully Commissioned Ormonde Ormonde
Fully Commissioned Rhyl Flats Rhyl Flats
Fully Commissioned Robin Rigg Robin Rigg
Fully Commissioned Scroby Sands Scroby Sands
Fully Commissioned Sheringham Shoal Sheringham Shoal
Fully Commissioned Teesside Teesside
Fully Commissioned Thanet Thanet
Fully Commissioned Walney Phase 1 Walney Phase 1
Fully Commissioned Walney Phase 2 Walney Phase 2
Fully Commissioned Wave Hub Wave Hub
Fully Commissioned West of Duddon Sands West of Duddon Sands
Fully Commissioned Westermost Rough Westermost Rough
Partial Generation/Under Construction Burbo Bank Extension Burbo Bank Extension
Partial Generation/Under Construction Dudgeon Dudgeon
Under Construction Galloper Galloper
Under Construction Race Bank Race Bank
Under Construction Rampion Rampion
Pre-Construction Aberdeen Offshore Wind Farm (EOWDC) Aberdeen Offshore Wind Farm (EOWDC)
Pre-Construction Beatrice Beatrice
Pre-Construction Blyth Offshore Demonstrator Project - Array 2 Blyth Offshore Demonstrator Project - Array 2
Pre-Construction East Anglia ONE East Anglia ONE
Pre-Construction Hornsea Project One Hornsea Project One
Pre-Construction Hywind Scotland Pilot Park Hywind Scotland Pilot Park
Pre-Construction Walney Extension Walney Extension
Consent Authorised Blyth Offshore Demonstrator Project - Array 3A & 4 Blyth Offshore Demonstrator Project - Array 3A & 4
Consent Authorised Dogger Bank - Creyke Beck A Dogger Bank - Creyke Beck A
Consent Authorised Dogger Bank - Creyke Beck B Dogger Bank - Creyke Beck B
Consent Authorised Dogger Bank - Teesside A Dogger Bank - Teesside A
Consent Authorised Dogger Bank - Teesside B Dogger Bank - Teesside B
Consent Authorised Dounreay Trì Dounreay Trì
123
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at http://www.4coffshore.com/windfarms/windfarms.aspx?windfarmID=uk76.