Q4
78 MW Consent Authorised Netherlands
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Able Seaton Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 15 m
Entrance Width: 125 m
Spring Tidal Range: 4.6 m
Quay Length: 791 m
Quay Loading Capability: 60 tonnes/m2
Land for Development: 45 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
Vessels & Equipment Available for Immediate Charter
Statistics for Q4
Wind Farm Name Q4 (also known as 25 (ID assigned by authority)) correct
CountryNetherlands
Region Noord-Holland correct
SeaName North Sea correct
Centre Latitude 52.675°
Centre Longitude 4.250°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or callRound 2 (NL)
Development Status Consent Authorised correct
Comments on the StatusDraft approval given after revisions to original application. Final decision expected after February 2nd 2010 when consultation period closes
Status Documentation This is the Decision Document
Capacity 78 MW correct
Turbine Capacity 3 MW correct
Number of Turbines 26 correct
Turbine Model V90-3.0 MW Offshore (Vestas) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 90 m correct
Total Turbine Height 110 m correct
Hub Height 65 m correct
Other comments correct
Foundation Grounded: Monopile correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 17 km2
Water Depth Min (Chart Datum) 21 m correct
Water Depth Max (Chart Datum) 24 m correct
Depth range stated by developer correct
Distance From Shore (reported) 24 km correct
Distance From Shore (computed from wind farm centre) 26 km
Export Cable Length 50 km correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 150 kV correct
Infield Cable Capacity 22 kV correct
Number of Export Cables 1 correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations 1 correct
Grid Connection Point Beverwijk/Velsen or Sassenheim correct
Cable Landing Point IJmuiden or Noordwijk correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 43,614 homes
CO2 Reduced Per Year 88,143 tonnes
SO2 Reduced Per Year 2,050 tonnes
Website Visit correct

Events on Q4
DateTypeDescriptionSourceCorrect
18-Dec-2009
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Draft approval after revisions Visit correct
26-Jun-2009
Event Type: Planning - Consent Application Declined                                                                                                                                                                                                                        Planning - Consent Application Declined
Draft refusal due to possible effect on bird life Visit correct
10-Feb-2005
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
Application submitted by E-Connection Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Q4 offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Q4 More weather tools available on 4C Interactive Map. More weather forecast tools