Södra Midsjöbanken
700 MW Consent Application Submitted Sweden
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Able Humber Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 11 m
Entrance Width: 840 m
Spring Tidal Range: 6.4 m
Quay Length: 1279 m
Quay Loading Capability: 20 tonnes/m2
Land for Development: 647 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
Vessels on Södra Midsjöbanken
VesselRoleOrganisationDescriptionCorrect
IceBeam Vessel-Survey MMT AB Period: Feb-2011 to Apr-2011
The IceBeam is conducting geophysical, geotechnical and biological seabed investigations. More...
correct
Vessels & Equipment Available for Immediate Charter
Statistics for Södra Midsjöbanken
Wind Farm Name Södra Midsjöbanken correct
CountrySweden
Region Mörbylånga Kommun correct
SeaName Baltic Sea correct
Centre Latitude 55.672°
Centre Longitude 17.267°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Consent Application Submitted correct
Comments on the Status 
Status Documentation
Capacity 700 MW correct
Turbine Capacity 3.6 MW - 7 MW correct
Number of Turbines 100 - 300 correct
Turbine Model Not Decided correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter correct
Total Turbine Height correct
Hub Height correct
Other comments
Up to 3 substations.
Project could connect to the yet-to-be-built NordBalt HVDC Interconnector linking Sweden and Lithuania. correct
Foundation Not Decided correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 1,060 km2
Water Depth Min (Chart Datum) 14 m correct
Water Depth Max (Chart Datum) 40 m correct
Depth range stated by developer 12 m - 28 m correct
Distance From Shore (reported) 70 km correct
Distance From Shore (computed from wind farm centre) 78.9 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations 3 correct
Grid Connection Point correct
Cable Landing Point correct
Annual Capacity Factor 34.20 correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost SEK(mill) 20000.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 391,404 homes
CO2 Reduced Per Year 791,028 tonnes
SO2 Reduced Per Year 18,396 tonnes
Website Visit correct

Events on Södra Midsjöbanken
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Estimated start for generating power. Subscribe correct
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Estimated start for offshore construction. Subscribe correct
21-Mar-2012
Event Type: Installation - Met Mast                                                                                                                                                                                                                                        Installation - Met Mast
Installed met mast. Visit correct
Feb-2012
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
The permit application containing technical studies and environmental impact assessment for the project has been completed and submitted to the Ministry of the Environment and the Ministry for processing. Visit correct
2012
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Construction permits expected in 2012 Other correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Södra Midsjöbanken offshore wind farm Please note, your comment will take 1 hour to appear.