SWAY 1:6 Prototype
Fully Commissioned Norway
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Harwich Navyard, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 8.5 m
Entrance Width:
Spring Tidal Range: 4.8 m
Quay Length: 175 m
Quay Loading Capability:
Land for Development:
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
RoleOrganisationDescription 
Developer SWAY A/S correct
Owner SWAY A/S
Percentage: Subscribe
correct
Vessels on SWAY 1:6 Prototype
Vessels & Equipment Available for Immediate Charter
Statistics for SWAY 1:6 Prototype
Wind Farm Name SWAY 1:6 Prototype correct
CountryNorway
Region Hordaland correct
SeaName North Sea correct
Centre Latitude 60.549° (Note: Estimated/Illustrative Location)
Centre Longitude 4.906° (Note: Estimated/Illustrative Location)
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Fully Commissioned correct
Comments on the Status 
Status Documentation
Capacity correct
Turbine Capacity correct
Number of Turbines 1 correct
Turbine Model Not Decided correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter correct
Total Turbine Height correct
Hub Height correct
Other comments correct
Foundation Floating: Spar Floater correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area
Water Depth Min (Chart Datum) correct
Water Depth Max (Chart Datum) correct
Depth range stated by developer correct
Distance From Shore (reported) correct
Distance From Shore (computed from wind farm centre)
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations 0 correct
Grid Connection Point correct
Cable Landing Point correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base Kollsnes correct
Port For Ops and Maintenance Kollsnes correct
Number of homes powered annually:
CO2 Reduced Per Year
SO2 Reduced Per Year
Website Visit correct

Events on SWAY 1:6 Prototype
DateTypeDescriptionSourceCorrect
2013
Event Type: Decommissioning -                                                                                                                                                                                                                                              Decommissioning -
The testing will last for 1-2 years. Visit correct
11-Nov-2011
Event Type: Engineering - PreTesting                                                                                                                                                                                                                                       Engineering - PreTesting
The 1/6 model sank due to the wave conditions were too severe for a scale model Visit correct
10-Jun-2011
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
The site was opened and started testing. Visit correct
31-Mar-2011
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Floating Wind Turbine Prototype deployed Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc. Challenges experienced on SWAY 1:6 Prototype
Be the first to comment on SWAY 1:6 Prototype offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for SWAY 1:6 Prototype More weather tools available on 4C Interactive Map. More weather forecast tools