Utgrunden I
10.5 MW Fully Commissioned Sweden
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Able Seaton Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 15 m
Entrance Width: 125 m
Spring Tidal Range: 4.6 m
Quay Length: 791 m
Quay Loading Capability: 60 tonnes/m2
Land for Development: 45 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
12
VesselRoleOrganisationDescriptionCorrect
M/S Honte Vessel-Array Cable Installation(burial) JD-Crafts A/S Honte used for embedding 2.3km of array cabling - Client: JD-Contractor A/S More... correct
Cable One Vessel-Array Cable Installation(cable lay) JD-Crafts A/S Cable One used for recovery of existing cable and lay of 2.3km of new cable - Client: JD-Contractor A/S More... correct
Helle Saj Vessel-Array Cable Installation(trench excavation) JD-Crafts A/S Helle Saj used for excavating 2.3km of array cable trenches and the covering of laid cable - Client: JD-Contractor A/S More... correct
Helle Saj Vessel-Engineering JD-Contractor A/S Period: Jun-2006 to Jul-2006
The Helle Saj covered the cables post lay. More...
correct
Helle Saj Vessel-Export Cable Installation(burial) JD-Crafts A/S Helle Saj was used to excavate trenches for the cables at a depth from 2.5 to 10 metres also to cover cables to a depth of 0 to 2.5 m into seabed - Client: JD-Contractor A/S More... correct
M/S Honte Vessel-Export Cable Installation(cable lay) JD-Crafts A/S Period: Jun-2006
The Honte was used for laying the new cable and moving the existing cable to the bottom of the trench - Client: JD-Contractor A/S More...
correct
Helle Saj Vessel-Export Cable Installation(trench excavation) JD-Crafts A/S Helle Saj was used to excavate trenches for the cables at a depth from 2.5 to 10 metres also to cover cables to a depth of 0 to 2.5 m into seabed - Client: JD-Contractor A/S More... correct
Wind (NG-600) Vessel-Foundation Installation(turbine) DBB Jack-up Services A/S Installation of 7 monopile foundations - September 2000 - Client: Hydro Soil Services NV More... correct
Explorer (Jack-up platform) Vessel-Support JD-Contractor A/S Period: Jun-2006 to Jul-2006
The Explorer was used for cable splicing at sea. More...
correct
Wind (NG-600) Vessel-Transition Piece Installation(turbine) DBB Jack-up Services A/S Installation of 7 transition pieces - September 2000 - Client: Hydro Soil Services NV More... correct
12
Vessels & Equipment Available for Immediate Charter
Statistics for Utgrunden I
Wind Farm Name Utgrunden I correct
CountrySweden
Region Mörbylånga Kommun correct
SeaName Baltic Sea correct
Centre Latitude 56.344°
Centre Longitude 16.280°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Fully Commissioned correct
Comments on the Status 
Status Documentation
Capacity 10.5 MW correct
Turbine Capacity 1.5 MW correct
Number of Turbines 7 correct
Turbine Model Enron Wind 70/1500 (Enron Wind) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 70 m correct
Total Turbine Height 100 m correct
Hub Height 65 m correct
Other comments correct
Foundation Grounded: Monopile correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 0 km2
Water Depth Min (Chart Datum) 6 m correct
Water Depth Max (Chart Datum) 15 m correct
Depth range stated by developer correct
Distance From Shore (reported) 4.2 km correct
Distance From Shore (computed from wind farm centre) 7.3 km
Export Cable Length 11 km correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 21 kV correct
Infield Cable Capacity 21 kV correct
Number of Export Cables 1 correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations 0 correct
Grid Connection Point correct
Cable Landing Point Oland correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost GBP(mill) 12.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base Frederikshavn correct
Port For Ops and Maintenance correct
Number of homes powered annually: 5,871 homes
CO2 Reduced Per Year 11,865 tonnes
SO2 Reduced Per Year 276 tonnes
Website Visit correct

Events on Utgrunden I
DateTypeDescriptionSourceCorrect
Jul-2006
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
Replacement of export cable finishes. Visit correct
Jun-2006
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
Replacement of export cable starts. Visit correct
2006
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
Exchange export cable. Other correct
Feb-2005
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
Replaced all infield cables finishes. Other correct
Oct-2004
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
Replaced all infield cables starts. Other correct
31-Oct-2000
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Turbine installation finishes. Visit correct
30-Sep-2000
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
Foundation installation finishes. Visit correct
Sep-2000
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Turbine installation starts. Visit correct
Sep-2000
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
Foundation installation starts. Visit correct
2000
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Started to generate power in 2000. Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Utgrunden I offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Utgrunden I More weather tools available on 4C Interactive Map. More weather forecast tools