Veja Mate
400 MW Consent Authorised Germany
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Able Seaton Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 15 m
Entrance Width: 125 m
Spring Tidal Range: 4.6 m
Quay Length: 791 m
Quay Loading Capability: 60 tonnes/m2
Land for Development: 45 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
Vessels & Equipment Available for Immediate Charter
Statistics for Veja Mate
Wind Farm Name Veja Mate correct
CountryGermany
Region Exclusive Economic Zone (BorWin) correct
SeaName North Sea correct
Centre Latitude 54.317°
Centre Longitude 5.871°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Consent Authorised correct
Comments on the Status 
Status Documentation This is the Approval Document
Capacity 400 MW correct
Turbine Capacity 5 MW correct
Number of Turbines 80 correct
Turbine Model Bard 5.0 (Bard) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 122 m correct
Total Turbine Height 151 m correct
Hub Height 90 m correct
Other comments The wind farm will be connected to the BorWin2 grid connection. correct
Foundation Grounded: Tripile correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 50 km2
Water Depth Min (Chart Datum) 39 m correct
Water Depth Max (Chart Datum) 41 m correct
Depth range stated by developer 39 m - 41 m correct
Distance From Shore (reported) 114.1 km correct
Distance From Shore (computed from wind farm centre) 114.1 km
Export Cable Length 10 km correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 155 kV correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations 1 correct
Grid Connection Point BorWin2 (beta) offshore converter platform - Diele substation (Onshore) correct
Cable Landing Point Hilgenriedersiel correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost EUR(mill) 800.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 223,660 homes
CO2 Reduced Per Year 452,016 tonnes
SO2 Reduced Per Year 10,512 tonnes
Website Visit correct

Events on Veja Mate
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Estimated Installation Start Year after completion of BARD Offshore 1. This could be put back to Subscribe over concerns from TenneT. Subscribe correct
31-Oct-2012
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Expiration date of permit if offshore works not started Visit correct
05-Apr-2012
Event Type: Planning - Other Approval                                                                                                                                                                                                                                      Planning - Other Approval
The Federal Maritime and Hydrographic Agency (BSH) has approved the converter platform "BorWin Beta" and the HVDC export cables associated with it. Visit correct
2012
Event Type: Installation - Other                                                                                                                                                                                                                                           Installation - Other
The Borwin2 Grid Connection was originally scheduled to be installed in 2012 Visit correct
31-Aug-2009
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Consent authorised. Project meets necessary location conditions as outlined in SeeAnlV Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Veja Mate offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Veja Mate More weather tools available on 4C Interactive Map. More weather forecast tools