Turbine Installation Vessels (5)

VesselRoleOrganisation 
LogIn Vessel-Foundation Installation(turbine)
GeoSea NV (DEME NV)
Client: LogIn
Period: 20-Feb-2014 to 25-May-2014
correct
LogIn Vessel-Transition Piece Installation(turbine)
GeoSea NV (DEME NV)
Client: LogIn
Period: 20-Feb-2014 to 25-May-2014
The vessel was used to install 35 transition pieces.
Number of transition pieces installed: LogIn
correct
LogIn Vessel-Turbine Installation
A2SEA A/S (DONG Energy AS)
Client: LogIn
Period: 19-Oct-2014 to 24-Nov-2014
correct
LogIn Vessel-Turbine Installation
A2SEA A/S (DONG Energy AS)
Client: LogIn
Period: 27-Dec-2014 to 27-Mar-2015
correct
LogIn Vessel-Turbine Installation
A2SEA A/S (DONG Energy AS)
Client: LogIn
Period: 08-Aug-2014 to 23-Aug-2014
correct

Substation Installation Vessels (1)

VesselRoleOrganisation 
LogIn Vessel-Substation Installation
Seaway Heavy Lifting Ltd (Subsea 7)
Client: LogIn
Period: 22-May-2014 to 03-Jun-2014
correct

Cable Installation Vessels (8)

VesselRoleOrganisation 
LogIn Vessel-Array Cable Installation
Solstad Offshore ASA
Client: LogIn
Period: 12-Jun-2014 to 26-Nov-2014
Technip utilised the Normand Pioneer for the simultaneous lay, cutting and jetting burial using the CBT1100 trencher from a carousel.
correct
LogIn Vessel-Array Cable Installation(components)
Sealion Shipping Ltd
Client: LogIn
Period: 12-Jun-2014 to 27-Nov-2014
correct
LogIn Vessel-Boulder Removal(seabed clearance)
Atlantic Marine & Aviation LLP
Client: LogIn
Period: 05-Jul-2014 to 11-Jul-2014
correct
LogIn Vessel-Boulder Removal(seabed clearance)
Atlantic Marine & Aviation LLP
Client: LogIn
Period: 10-Jun-2014 to 23-Jun-2014
correct
LogIn Vessel-Cable Installation correct
LogIn Vessel-Cable Installation
Maersk Supply Services
Client: LogIn
Period: 25-Aug-2014 to 29-Aug-2014
correct
LogIn Vessel-Export Cable Installation
Stemat Marine Services BV (Boskalis International (S) Pte Ltd)
Client: LogIn
Period: 20-Feb-2014 to 02-Mar-2014
Stemat Spirit carried out export cable installation. The original scheduled estimated to start operations in March 2014.
correct
LogIn Vessel-Route Clearance(PLGR)
Peter Madsen Rederi A/S and Svensk Sjöentreprenad AB
Client: LogIn
Period: 05-Jul-2013 to 14-Mar-2014
correct

Met Mast Installation Vessels (0)

Survey Vessels (4)

VesselRoleOrganisation 
LogIn Vessel-Survey
Fugro EMU Limited (Fugro)
Period: 03-Jun-2015 to 13-Jul-2015
correct
LogIn Vessel-Survey(Geophysical)
Gardline Marine Sciences Ltd (GMSL) (Gardline Shipping Ltd.)
Client: LogIn
Period: 15-Feb-2011 to 31-Mar-2011
correct
LogIn Vessel-Survey(Geotechnical)
MMT AB
Client: LogIn
Period: 25-Nov-2012 to 15-Feb-2013
MMT vessel Ice Beam was used to conduct geotechnical site survey over a period of three months.
correct
LogIn Vessel-Survey(Geotechnical)
Fugro Seacore Limited (Fugro)
Client: LogIn
Period: 26-Jul-2013 to 02-Aug-2013
correct

Operations and Maintenance Vessels (including Crew Transfer) (53)

VesselRoleOrganisation 
LogIn Vessel-Crew Transfer
Dalby Offshore Services Ltd.
Period: 27-Sep-2016 to Oct-2016
correct
LogIn Vessel-Crew Transfer
CWind Ltd (Global Marine Systems Ltd)
Client: LogIn
Period: 03-Jun-2015 to 12-Oct-2015
correct
LogIn Vessel-Crew Transfer
Turbine Transfers Limited (Holyhead Towing Company Ltd)
Period: 22-May-2015 to 22-Sep-2015
correct
LogIn Vessel-Crew Transfer
Northern Offshore Services A/S
Client: LogIn
Period: 29-Nov-2016 to 05-Dec-2016
correct
LogIn Vessel-Crew Transfer
Dalby Offshore Services Ltd.
Period: 15-Jan-2014 to Mar-2014
correct
LogIn Vessel-Crew Transfer
Turbine Transfers Limited (Holyhead Towing Company Ltd)
Period: 20-Oct-2013 to 23-Mar-2015
correct
LogIn Vessel-Crew Transfer
Seacat Services Ltd
Client: LogIn
Period: 25-Aug-2015 to 28-Sep-2015
correct
LogIn Vessel-Crew Transfer
Turbine Transfers Limited (Holyhead Towing Company Ltd)
Period: 05-Aug-2015 to 27-Aug-2015
correct
LogIn Vessel-Crew Transfer
Northern Offshore Services A/S
Period: 07-Jan-2017 to 09-Feb-2017
correct
LogIn Vessel-Crew Transfer
ESVAGT A/S
Client: LogIn
Period: 27-Feb-2015 to 21-May-2015
Esvagt STB 7B 1 provided crew transfers from Esvagt Froude to turbine locations.
correct
LogIn Vessel-Crew Transfer correct
LogIn Vessel-Crew Transfer
Northern Offshore Services A/S
Period: 03-Nov-2015 to 03-Dec-2015
correct
LogIn Vessel-Crew Transfer
Tidal Transit Ltd
Period: 10-Jun-2015 to Oct-2015
correct
LogIn Vessel-Crew Transfer
Seacat Services Ltd
Period: 15-Feb-2014 to Mar-2014
Seacat Reliance provided crew transfer services on site.
correct
LogIn Vessel-Crew Transfer
Seacat Services Ltd
Period: 12-Mar-2014 to 26-Dec-2014
correct
LogIn Vessel-Crew Transfer correct
LogIn Vessel-Crew Transfer
Njord Offshore
Period: Jun-2014 to 04-Nov-2014
correct
LogIn Vessel-Crew Transfer
Njord Offshore
Client: LogIn
Period: 31-May-2014 to 08-Nov-2014
correct
LogIn Vessel-Crew Transfer
CWind Ltd (Global Marine Systems Ltd)
Client: LogIn
Period: 28-Apr-2014 to 23-Oct-2014
correct
LogIn Vessel-Crew Transfer
MPI Workboats (MPI Offshore Ltd)
Period: 21-Feb-2014 to 20-Nov-2014
correct
LogIn Vessel-Crew Transfer
Turbine Transfers Limited (Holyhead Towing Company Ltd)
Client: LogIn
Period: 08-Jun-2014 to 12-Aug-2014
correct
LogIn Vessel-Crew Transfer
Seacat Services Ltd
Client: LogIn
Period: 09-Jun-2014 to 30-Aug-2014
correct
LogIn Vessel-Crew Transfer
Seacat Services Ltd
Period: 15-Jun-2014 to 29-Jan-2015
correct
LogIn Vessel-Crew Transfer correct
LogIn Vessel-Crew Transfer
Windpower Support Limited
Period: 06-Jun-2014 to 18-Jun-2014
correct
LogIn Vessel-Crew Transfer
Windwave Workboats
Client: LogIn
Period: 07-Jun-2016 to 05-Jul-2016
correct
LogIn Vessel-Crew Transfer
CWind Ltd (Global Marine Systems Ltd)
Client: LogIn
Period: 08-Jun-2016 to 22-Jun-2016
correct
LogIn Vessel-Crew Transfer
Windcrew Workboats
Period: 19-Aug-2014 to 03-Oct-2014
correct
LogIn Vessel-Crew Transfer
Turbine Transfers Limited (Holyhead Towing Company Ltd)
Period: 16-Aug-2014 to 30-Sep-2014
Cymyran Bay provided crew transfer services.
correct
LogIn Vessel-Crew Transfer
MPI Workboats (MPI Offshore Ltd)
Period: 31-Aug-2014 to 17-Dec-2014
correct
LogIn Vessel-Crew Transfer
Turbine Transfers Limited (Holyhead Towing Company Ltd)
Period: 30-Aug-2014 to 28-Nov-2014
correct
LogIn Vessel-Crew Transfer
Turbine Transfers Limited (Holyhead Towing Company Ltd)
Client: LogIn
Period: 23-May-2014 to 05-Dec-2014
correct
LogIn Vessel-Crew Transfer
Tidal Transit Ltd
Client: LogIn
Period: 04-Oct-2014 to May-2015
Kitty Petra provided crew transfer services on site. She worked out of Grimsby on a 24 hour / 7 day basis, returning to port for shift changes. Siemens extended the contract from Jan 2015 to the end of April 2015.
correct
LogIn Vessel-Crew Transfer
Njord Offshore
Period: 08-Nov-2014 to 27-Nov-2014
correct
LogIn Vessel-Crew Transfer
Windwave Workboats
Period: 21-Aug-2016 to 26-Nov-2016
correct
LogIn Vessel-Crew Transfer
Turbine Transfers Limited (Holyhead Towing Company Ltd)
Period: 16-Oct-2014 to 24-Feb-2015
correct
LogIn Vessel-Crew Transfer
Windcrew Workboats
Period: 24-Dec-2014 to 12-Nov-2015
correct
LogIn Vessel-Crew Transfer
Turbine Transfers Limited (Holyhead Towing Company Ltd)
Period: 29-Dec-2014 to 24-Mar-2015
correct
LogIn Vessel-Crew Transfer
Turbine Transfers Limited (Holyhead Towing Company Ltd)
Client: LogIn
Period: 05-Feb-2015 to Jul-2015
correct
LogIn Vessel-Crew Transfer
CWind Ltd (Global Marine Systems Ltd)
Client: LogIn
Period: 26-Oct-2016 to 09-Nov-2016
correct
LogIn Vessel-Crew Transfer
Northern Offshore Services A/S
Period: 17-Feb-2015 to 08-Apr-2015
correct
LogIn Vessel-Crew Transfer
Turbine Transfers Limited (Holyhead Towing Company Ltd)
Client: LogIn
Period: 07-Sep-2014 to 11-Sep-2014
correct
LogIn Vessel-Crew Transfer correct
LogIn Vessel-Crew Transfer
Turbine Transfers Limited (Holyhead Towing Company Ltd)
Period: 25-Feb-2015 to 07-May-2015
correct
LogIn Vessel-Crew Transfer
Seacat Services Ltd
Period: 08-Apr-2015 to 14-Jun-2015
correct
LogIn Vessel-Crew Transfer
Northern Offshore Services A/S
Period: 16-Mar-2015 to 19-Dec-2016
correct
LogIn Vessel-Crew Transfer
Windcrew Workboats
Period: 19-Apr-2015 to 30-Apr-2015
correct
LogIn Vessel-Crew Transfer
World Marine Offshore
Period: 10-Apr-2015 to 29-Jul-2015
correct
LogIn Vessel-Crew Transfer
Seacat Services Ltd
Period: 24-Mar-2015 to 07-Apr-2015
correct
LogIn Vessel-Crew Transfer
Seacat Services Ltd
Period: 07-May-2015 to 31-Jul-2015
correct
LogIn Vessel-Crew Transfer
CWind Ltd (Global Marine Systems Ltd)
Client: LogIn
Period: 19-May-2015 to 16-Jul-2015
correct
LogIn Vessel-Crew Transfer
Tidal Transit Ltd
Client: LogIn
Period: 04-Jun-2015 to 11-Dec-2015
correct
LogIn Vessel-Heavy Maintenance
A2SEA A/S (DONG Energy AS)
Client: LogIn
Period: 08-Jun-2016 to 05-Jul-2016
correct

Other Vessels (3)

VesselRoleOrganisation 
LogIn Vessel-Construction Support (W2W)
Simon Møkster Shipping AS
Client: LogIn
Period: 24-Sep-2014 to 19-Jan-2015
The vessel provided accommodation and gangway services on the partially generating site during this period.
correct
LogIn Vessel-Construction Support (W2W)
ESVAGT A/S
Client: LogIn
Period: 27-Feb-2015 to 21-May-2015
correct
LogIn Vessel-Support
Acta Marine
Period: 26-Feb-2014 to 02-Mar-2014
correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

Did you know?

You get monthly updates with our Offshore Windfarm Subscription and receive even more detailed information about: turbines costs foundations substations converters cabling

Filter :
123
StatusName
Decommissioned Beatrice Demonstration Beatrice Demonstration
Decommissioned Blyth Blyth
Fully Commissioned Barrow Barrow
Fully Commissioned Burbo Bank Burbo Bank
Fully Commissioned Greater Gabbard Greater Gabbard
Fully Commissioned Gunfleet Sands Gunfleet Sands
Fully Commissioned Gunfleet Sands 3 - Demonstration Project Gunfleet Sands 3 - Demonstration Project
Fully Commissioned Gwynt y Môr Gwynt y Môr
Fully Commissioned Humber Gateway Humber Gateway
Fully Commissioned Hunterston Test Centre - Mitsubishi 7MW (onshore) Hunterston Test Centre - Mitsubishi 7MW (onshore)
Fully Commissioned Hunterston Test Centre - Siemens 6MW (onshore) Hunterston Test Centre - Siemens 6MW (onshore)
Fully Commissioned Hunterston Test Centre (onshore) Hunterston Test Centre (onshore)
Fully Commissioned Inner Dowsing Inner Dowsing
Fully Commissioned Kentish Flats Kentish Flats
Fully Commissioned Kentish Flats Extension Kentish Flats Extension
Fully Commissioned Levenmouth demonstration turbine Levenmouth demonstration turbine
Fully Commissioned Lincs Lincs
Fully Commissioned London Array London Array
Fully Commissioned Lynn Lynn
Fully Commissioned North Hoyle North Hoyle
Fully Commissioned Ormonde Ormonde
Fully Commissioned Rhyl Flats Rhyl Flats
Fully Commissioned Robin Rigg Robin Rigg
Fully Commissioned Scroby Sands Scroby Sands
Fully Commissioned Sheringham Shoal Sheringham Shoal
Fully Commissioned Teesside Teesside
Fully Commissioned Thanet Thanet
Fully Commissioned Walney Phase 1 Walney Phase 1
Fully Commissioned Walney Phase 2 Walney Phase 2
Fully Commissioned Wave Hub Wave Hub
Fully Commissioned West of Duddon Sands West of Duddon Sands
Fully Commissioned Westermost Rough Westermost Rough
Partial Generation/Under Construction Burbo Bank Extension Burbo Bank Extension
Partial Generation/Under Construction Dudgeon Dudgeon
Under Construction Beatrice Beatrice
Under Construction Galloper Galloper
Under Construction Race Bank Race Bank
Under Construction Rampion Rampion
Pre-Construction Aberdeen Offshore Wind Farm (EOWDC) Aberdeen Offshore Wind Farm (EOWDC)
Pre-Construction Blyth Offshore Demonstrator Project - Array 2 Blyth Offshore Demonstrator Project - Array 2
Pre-Construction East Anglia ONE East Anglia ONE
Pre-Construction Hornsea Project One Hornsea Project One
Pre-Construction Hywind Scotland Pilot Park Hywind Scotland Pilot Park
Pre-Construction Walney Extension Walney Extension
Consent Authorised Blyth Offshore Demonstrator Project - Array 3A & 4 Blyth Offshore Demonstrator Project - Array 3A & 4
Consent Authorised Dogger Bank - Creyke Beck A Dogger Bank - Creyke Beck A
Consent Authorised Dogger Bank - Creyke Beck B Dogger Bank - Creyke Beck B
Consent Authorised Dogger Bank - Teesside A Dogger Bank - Teesside A
Consent Authorised Dogger Bank - Teesside B Dogger Bank - Teesside B
Consent Authorised Dounreay Trì Dounreay Trì
123
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at http://www.4coffshore.com/windfarms/vesselspread.aspx?windfarmID=uk34.