Wikinger
400 MW Consent Authorised Germany
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
BOW Terminal Vlissingen, The Netherlands Image of <%# Eval("PortName") %> Maximum Trenched Depth: 11 m
Entrance Width: 250 m
Spring Tidal Range: 5 m
Quay Length: 1400 m
Quay Loading Capability: 15 tonnes/m2
Land for Development: 7 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
Vessels & Equipment Available for Immediate Charter
Statistics for Wikinger
Wind Farm Name Wikinger (also known as (formerly known as Ventotec Ost 2)) correct
CountryGermany
Region Exclusive Economic Zone (Baltic) correct
SeaName Baltic Sea correct
Centre Latitude 54.834°
Centre Longitude 14.068°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Consent Authorised correct
Comments on the StatusOriginally consented for floating turbines. Reapplication for consent had to be made after Iberdrola chose to use fixed structures rather than floating turbines.
Status Documentation Visit Document
Capacity 400 MW correct
Turbine Capacity 5 MW correct
Number of Turbines 80 correct
Turbine Model Not Decided correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter correct
Total Turbine Height correct
Hub Height correct
Other comments correct
Foundation Not Decided correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 34 km2
Water Depth Min (Chart Datum) 36 m correct
Water Depth Max (Chart Datum) 40 m correct
Depth range stated by developer 25 m - 45 m correct
Distance From Shore (reported) 35 km correct
Distance From Shore (computed from wind farm centre) 39.2 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point Lubmin correct
Cable Landing Point Lubmin correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 223,660 homes
CO2 Reduced Per Year 452,016 tonnes
SO2 Reduced Per Year 10,512 tonnes
Website Visit correct

Events on Wikinger
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Under current plans the wind farm will start to produce power in Subscribe. Subscribe correct
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Construction is expected to start in Subscribe Subscribe correct
2014
Event Type: Planning - Other Application Submitted                                                                                                                                                                                                                         Planning - Other Application Submitted
Submit final plans for the project. Visit correct
26-Aug-2011
Event Type: Planning - Other Application Submitted                                                                                                                                                                                                                         Planning - Other Application Submitted
Made first application for permits to the German Federal Maritime and Hydrographic Agency (BSH) this stage will include detailed design plans and an environmental impact report. Visit correct
21-Mar-2010
Event Type: PrePlanning - Strategy Development                                                                                                                                                                                                                             PrePlanning - Strategy Development
Iberdrola bought the rights from the existing owners. Visit correct
16-May-2007
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Approval of wind farm by Federal maritime and Hydrographic agency (BSH) under the old developers before Iberdrola. Using floating turbines rather than Iberdrola's fixed structures. Visit correct
23-Oct-2001
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
Date of application. Updated 9/12/2002 and 23/09/2003 Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Wikinger offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Wikinger More weather tools available on 4C Interactive Map. More weather forecast tools