Nordsee Ost
295.2 MW Under Construction Germany

"The database has become an invaluable tool with regard to business planning and the regular updates from the 4C Offshore team on the project specifics ensure that, as a tier 1 supplier, we remain well informed and able to react to market developments."

Darren Taylor, NKT Cables

  • All Projects
  • Followed Projects

Latest Windfarm News
Iberdola launches offshore pile testing campaign for wikinger project
Your Renewable News (press release)
The Wikinger offshore wind farm is being developed by IBERDROLA, off the coast of the island of Rügen where the water depths range between 37 and 43 metres. The project covers an area of roughly 34km², within which 70 turbines and one offshore ...
Source: news.google.com
01/10/2014 14:58:15

Masdar Abu Dhabi Future Energy Co. to buy half of Statoil's shares in Dudgeon ...
eNewsWire (press release)
It has recently been announced by TUjobs.com that Masdar (Abu Dhabi Future Energy Co.) will buy half of Statoil's shares in Dudgeon offshore wind farm. In June, Statoil, in collaboration with Statkraft, decided to build the offshore wind park, Dudgeon, off the ...
Source: news.google.com
01/10/2014 14:20:33

New wind energy system wins approval in Scotland
Hydrogen Fuel News
Scotland has a major interest in wind energy. The country is currently home to some of the most ambitious offshore wind projects that are taking form and these projects could have a major impact on the country's energy structure. Despite recent political issues ...
Source: news.google.com
01/10/2014 14:01:54

Smaller-Scale Wind Power Silently Spins Ahead
ecoRI news
By TIM FAULKNER/ecoRI News staff. Wind energy is not popular. Divisive utility-scale wind projects in Falmouth, Fairhaven and Portsmouth, R.I., as well as the protracted fights and acrimony caused by offshore wind farms Cape Wind and Deepwater Wind, ...
Source: news.google.com
01/10/2014 11:57:51

Lighting Up Wind Farms with Lidar
Pollution Solutions
ZephIR 300 has been mounted on a platform on the north east of the lighthouse using a specially designed support frame measuring wind direction and wind velocity and will augment wind measurements from onshore sources and from a dedicated offshore ...
Source: news.google.com
01/10/2014 11:34:18

Objections to wind turbines not strong enough
Bournemouth Echo
THE objections presented by MPs, elected Councillors and citizens of the area is the strongest and most extensively argued, on all points, of any offshore wind farm in the UK. Approval by Planning Inspectorate Assessment Team would mean that none of the ...
Source: news.google.com
01/10/2014 07:12:19

Offshore wind farm cable plans get council green light
Banffshire Journal
... an underground power cable run through the heart of the area, carrying electricity from a huge offshore wind farm has been approved. Councillors have given their backing to the application from Moray Offshore Renewables Ltd (MORL) to install the 20-mile ...
Source: news.google.com
30/09/2014 23:24:40

Offshore winds soon to power Cape Cod: Part I
Cape Cod Today
Editor's note: This piece originally appeared on "The Blog" at HuffingtonPost.com. It is reprinted here with the author's consent. The second and third parts will follow. By Stacy Clark. Cape Wind, North America's first offshore wind farm, will soon install 130 ...
Source: news.google.com
30/09/2014 17:38:11

Curtailment solutions boost confidence in China
Windpower Monthly (subscription)
In a written notice dated 5 June, the NEA put forward its first programme for an offshore wind-power grid feed-in tariff (FIT). The document put FIT rates, which will be for offshore wind at CNY 0.85/kWh ($0.136/kWh) and for intertidal installations at CNY ...
Source: news.google.com
30/09/2014 14:43:50

How to Cut Carbon, Ramp up Renewable Energy, and Rebuild the Energy Sector
The Equation: Blog of the Union of Concerned Scientists (blog)
The famous case in this region surrounds the Cape Wind project offshore of Massachusetts, but too many other wind projects have been delayed or cancelled because of objections that the landscape would be changed by the arrival of renewable energy.
Source: news.google.com
30/09/2014 15:32:00




4C Offshore Ltd. has achieved certification to the ISO 9001, ISO 14001 and OHSAS 18001 standards for quality, environmental, and health & safety management.
map not available
Developers/Owners/Operators
Project Details for Nordsee Ost
General Information Name Nordsee Ost correct
Other names Innogy Nordsee Ost correct
Country name Germany correct
Region Exclusive Economic Zone (HelWin) (BSH Cluster 4 in Draft Network Plan) correct
Comments According to the 2014 draft of the Offshore Network Development Plan, Nordsee Ost will have a grid connection of 288MW to HelWin1 indicating that the wind farm will be overpowered. correct
Round (or category) correct
Development status Under Construction correct
Comments on the status See events table for latest status correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 295.2 MW correct
Turbine Model 6.2M 126 (Senvion) correct
Turbine Capacity 6.15 MW correct
Number of Turbines 48 correct
Total Turbine Height 153 m correct
Hub Height 90.00 m correct
Rotor Diameter 126 m correct
Foundation Grounded: Jacket (Ordered from Aker Solutions. Each foundation is up to 50 metres high and weights approx. 550 tons. Foundation pedestal covers almost 400 square metres.) correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost EUR(mill) 1000.00 correct
Location & Environment Sea name North Sea correct
Centre latitude 54.444° correct
Centre longitude 7.682° correct
Area 36 km2 correct
Depth range (Chart Datum) 22 m - 25 m correct
Depth range stated by developer 22 m - 25 m correct
Distance From Shore (reported) 57 km correct
Distance From Shore (computed from centre) 51.4 km correct
Ports Installation base Bremerhaven, Landskrona(array cables) correct
Ops and maintenance Heligoland correct
Grid Converter platforms HelWin Alpha (NOR-4-1 in O-NEP) correct
Offshore transformers Nordsee Ost Substation correct
Grid connection point HelWin1 (alpha) offshore substation - Büttel (onshore) substation correct
Cable landing point Büsum correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 2 correct
Average length per cable 5 km correct
Transmission type (e.g. HVAC) HVAC correct
Nominal voltage 155 kV correct
Maximum voltage correct
Power rating correct
Number of cores 3 correct
Conductor type Cu correct
Section Area 400 mm2 correct
Insulation XLPE correct
Number fibre optics 30 correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments Export cable connects substation to HelWin1(alpha) platform correct
Onshore Cables Number of onshore cables correct
Average length per cable 45 km correct
Comments HVDC correct
Array Cables Array cable length 60 km correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 33 kV correct
Maximum voltage 36 kV correct
Burial depth 1.5 m correct
Number of cores correct
Conductor type Al correct
Section 8042.50 mm2 correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 192571 correct
CO2 reduced per year 389186 tonnes correct
SO2 reduced per year 9051 tonnes correct
Expected life 25.0 years correct
Other Website Visit correct