Offshore Wind
Transmission
Vessels
Ports
4C is now TGS
We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.
By 2020, it aims to have doubled its installed wind capacity compared with 2016 from 3.0 GW to 6.5 GW. In 2016, the company produced 6TWh of wind energy. An Extraordinary General Meeting will be held on 30th October 2017 to formally decide the name change. As part of becoming Ørsted, a new logo and brand identity will be introduced. DONG Energy will change its stock exchange ticker to Orsted. The change in ticker will become effective from the start of trading on 31st October 2017, assuming a positive outcome at the general meeting. The roll out of the new name and design across DONG Energy’s markets, will begin on 6th November.
Premium
4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.