BalWin4 (NOR-9-3) Converter

According to TenneT and the Network Development plan (NEP) 2037/2045 (2023), TenneT will connect windfarms N-9.3 and N-10.2 via BalWin4 (NOR-9-3) and the border corridor N-III through the coastal sea via the island of Baltrum to the NVP Unterweser. Wind farms will connect via 66 kV. Transmission is 525 kV and rated at 2 GW. The subsea cable length is 165 km and 110 km onshore. Commissioning envisaged for 2029.
4C Offshore | Image Not Available
Name
BalWin4 (NOR-9-3) Converter
Status
Planned
Latitude
Unknown
Longitude
Unknown

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo