BorWin2 Converter

The BorWin2 project is a 800MW DC link which is used to feed large quantities of wind power into the grid. The land route from Hilgenriedersiel to Diele is 75 km long which will run parallel to the first route for the BorWin1 project. TenneT awarded Siemens the contract for this project. Originally Global Tech I and Veja Mate were connected to BorWin2 in 2015. In summer 2019 the 400MW grid connection of Global Tech I will be transferred from BorWin2 to BorWin3. The available capacity will be used to connect Deutsche Bucht and Albatros. Two 155kV AC cables will connect the 268.8MW DBU project in 2019. The 117MW Albatros project will also connect via a 155kV cable in 2019.
Converter
Name
BorWin2 Converter
Status
Operational
Latitude
54.355°
Longitude
6.025°

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Copyright © 4C Offshore 2021

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore