BorWin3 Converter

BorWin3 is a 160km long and a 900MW powerful high voltage DC connection. The underground cable is 30km and undersea cable 130km. The grid connection point is the Demden East converter station. The onshore grid connection point is expected to be at Emden/East, Lowe Saxony. Global Tech I will be installed when the converter is complete. Cable Comments: The land cable is a 320-kilovolt high-voltage direct current cable with a diameter of around twelve centimeters. It weighs 15.5 kilograms per meter. Due to the weight, approximately 1,150 meter long cable sections were connected with sleeves. With its copper core, the submarine cable even weighs over 40 kilograms per meter.
Converter
Name
BorWin3 Converter
Status
Operational
Latitude
54.388°
Longitude
6.380°

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Copyright © 4C Offshore 2021

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore