TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

LanWin4 (NOR-11-2) Converter

LanWin4 will connect windfarms N-11.2 and N-13.1 to the grid connection point (NVP) Wilhelmshaven2 in Lower Saxony. The routing of the DC cable system is via the border corridor N-III. It will use 525kV HVDC tech rated at 2 GW.Windfarms will connect directly via 66 kV. It requires 180 km submarine cable and 45km onshore. Commissioning envisaged for 2031.
4C Offshore | Image Not Available
Name
LanWin4 (NOR-11-2) Converter
Status
Planned
Latitude
54.906°
Longitude
6.315°

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo
Transmission Cable
Name
Number of Cables
Minimum Cable Length
Nominal Voltage
Comments