New Jersey Energy Link Converter

The New Jersey Energy Link was planned to be the first of three phases of the Atlantic Wind Connection, to be implemented over ten years. When proposed in 2010, the New Jersey Energy Link was to be installed by 2016, and as of 2013 this phase was expected to be installed by 2020 (with construction 2016-2019). Subsequent phases would include the Delmarva Link and the Bay Link. In 2014, BOEM suspended AWC’s Right of Way (ROW) Grant request because it had scaled back its proposal for the New Jersey Energy Link, so that it no longer interconnected BOEM WEAs and the did not fall under the bureau’s jurisdiction.
Converter
Name
New Jersey Energy Link Converter
Status
Tendering
Latitude
Longitude

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Copyright © 4C Offshore 2021

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore