SylWin1 Converter

The SylWin1 project involves a 864MW DC link. The wind projects located 70km to the west of Sylt will be able to feed large quantities of wind power into the German grid through the Slywin1 grid link. There will be 160km of submarine cable and 45km of overland cable. The submarine cable route in the coastal waters as well as the overland cable will run parallel to the route for the Helwin1 project. The link will be enough to supply up to 1.5 million German households with wind-generated power.
Converter
Name
SylWin1 Converter
Status
Operational
Latitude
55.063°
Longitude
7.241°

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Copyright © 4C Offshore 2021

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore