Cyclades Phase B: Evoia-Andros Interconnector

Cyclades Phase B: Evoia-Andros
(140.000 MW)

Landfall to Substation information missing.

Substation information missing.

Substation information missing.

Landfall to Substation information missing.

Greece
Greece

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Greece

Subsea Cabling

Cable Name Cyclades Phase B: Evoia-Andros
Cable Type
Cable Current HVAC
Status Fully Commissioned
Status Comments
Capacity MW 140.000 MW
Cable Tech
Total Length of Cable
Length Submarine 13.10 km
Length Land
DC Voltage
AC Voltage 150 kV
Configuration
Project Cost Mill
Project Cost Currency
Website Visit
Project Comments

Country & Landfall 2

Country
Greece
Designer-Other
Stakeholder
Description
EPC(I)-Cabling
Stakeholder
Description
Installer-Cabling
Stakeholder
Description
Installer-Onshore Cabling
Stakeholder
Description
Manufacturer-Cabling
Stakeholder
Description
Manufacturer-Onshore Cabling
Stakeholder
Description
Owner-Offshore Transmission
Stakeholder
Description
Vessel-Cable Installation
Stakeholder
Description
Date Event Description
Freemium Only 2019 Unlock with a freemium account Subscribers only field
Freemium Only 2019 Unlock with a freemium account Installation of Evoia-Andros connection completed ... Subscribers only field
Freemium Only 2019 Unlock with a freemium account Cable Enterprise completed cable installation... Subscribers only field
Freemium Only 2019 Unlock with a freemium account Cable Enterprise arrived on site to begin cable in... Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore