Nemo Link Interconnector

Richborough
Richborough
Nemo Link
(1000.000 MW)
Herdersbrug
Gezelle
United Kingdom
Belgium

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
United Kingdom
Landfall
Pegwell Bay
Cable Type Landfall To Converter
Underground
Converter
Richborough
Cable Type Converter To Substation
Underground
Substation
Richborough

Subsea Cabling

Cable Name Nemo Link
Cable Type Interconnector
Cable Current HVDC
Status Fully Commissioned
Status Comments TYNDP 2016 Project Index: 74, Project Classification: Mid-term Project, PCI Label: 1.1 TYNDP 2018 Project Index: 74
Capacity MW 1000.000 MW
Cable Tech
Total Length of Cable 140.00 km
Length Submarine 130.00 km
Length Land 10.00 km
DC Voltage 400 kV
AC Voltage
Configuration Symmetrical monopole
Project Cost Mill 690.00 Mill
Project Cost Currency EUR
Website Visit
Project Comments The project is called 'Thames Estuary' in the TYNDP 2018.

Country & Landfall 2

Country
Belgium
Landfall
Zeebrugge
Cable Type Landfall To Converter
Underground
Length Land Cable To Converter
8.85 Km
Converter
Herdersbrug
Cable Type Converter To Substation
Underground
Substation
Gezelle
Designer-Other
Stakeholder
Description
Developer
Stakeholder
Description
EPC(I)-Cabling
Stakeholder
Description
Installer-Cabling
Stakeholder
Description
Installer-HVDC Converter
Stakeholder
Description
Stakeholder
Description
Installer-Onshore Cabling
Stakeholder
Description
Maintenance-Cabling
Stakeholder
Description
Manufacturer-Cabling
Stakeholder
Description
Manufacturer-HVDC Converter
Stakeholder
Description
Manufacturer-HVDC Converter-Transformer
Stakeholder
Description
Manufacturer-Onshore Cabling
Stakeholder
Description
Owner-Offshore Transmission
Stakeholder
Description
Stakeholder
Description
Vessel-Cable Installation
Stakeholder
Description
Stakeholder
Description
Stakeholder
Description
Stakeholder
Description
Stakeholder
Description
Vessel-Export Cable Installation(trench excavation)
Stakeholder
Description
Vessel-Scour Protection Installation
Stakeholder
Description
Vessel-Support
Stakeholder
Description
Stakeholder
Description
Date Event Description
Freemium Only 2019 Unlock with a freemium account Subscribers only field
Freemium Only 2019 Unlock with a freemium account National Grid has submitted a request for (and bee... Subscribers only field
Freemium Only 2019 Unlock with a freemium account The cable was damaged by fishing gearsNational Gr... Subscribers only field
Freemium Only 2019 Unlock with a freemium account Elia is tendering a five-year contract( with possi... Subscribers only field
Freemium Only 2019 Unlock with a freemium account Elia started a tender process for seabed survey se... Subscribers only field
Freemium Only 2019 Unlock with a freemium account Elia started tender process for cable jointing for... Subscribers only field
Freemium Only 2019 Unlock with a freemium account Nemo link is operational.... Subscribers only field
Freemium Only 2019 Unlock with a freemium account Elia and National Grid succesfully tested the cabl... Subscribers only field
Freemium Only 2018 Unlock with a freemium account Sumitomo Electric has completed the connection of ... Subscribers only field
Freemium Only 2018 Unlock with a freemium account Elia and Nemo Link Ltd launch a public consultatio... Subscribers only field
Freemium Only 2018 Unlock with a freemium account Elia and National Grid inaugurated the first subma... Subscribers only field
Freemium Only 2018 Unlock with a freemium account Richborough converter will be connected to the 380... Subscribers only field
Freemium Only 2018 Unlock with a freemium account The Herdersbrug converter was connected to the 380... Subscribers only field
Freemium Only 2018 Unlock with a freemium account Elia launched a public consultation on the Elia an... Subscribers only field
Freemium Only 2018 Unlock with a freemium account The deep subsea cable installation is completed at... Subscribers only field
Freemium Only 2018 Unlock with a freemium account DeepOcean is due to complete the cable pull-ins by... Subscribers only field
Freemium Only 2017 Unlock with a freemium account The submarine cable in the UK section has been com... Subscribers only field
Freemium Only 2017 Unlock with a freemium account Following permits being given three months earlier... Subscribers only field
Freemium Only 2017 Unlock with a freemium account The installation vessel was loaded with two 59 km ... Subscribers only field
Freemium Only 2017 Unlock with a freemium account Elia and the European Investment Bank (EIB) conclu... Subscribers only field
Freemium Only 2017 Unlock with a freemium account The submarine cable installation is scheduled to s... Subscribers only field
Freemium Only 2017 Unlock with a freemium account Permits and planning approval was given for the Be... Subscribers only field
Freemium Only 2017 Unlock with a freemium account Unexploded ordnance (UXO) investigations began. On... Subscribers only field
Freemium Only 2017 Unlock with a freemium account The unexploded ordance (UXO) inspection operations... Subscribers only field
Freemium Only 2016 Unlock with a freemium account The main construction activities on the converter ... Subscribers only field
Freemium Only 2016 Unlock with a freemium account In this year UXO investigations were started.... Subscribers only field
Freemium Only 2015 Unlock with a freemium account The engineering design work and site preparation a... Subscribers only field
Freemium Only 2015 Unlock with a freemium account J-Power Systems was awarded the EPC contract for t... Subscribers only field
Freemium Only 2015 Unlock with a freemium account Elia and National Grid sign a joint venture agreem... Subscribers only field
Freemium Only 2014 Unlock with a freemium account The cap and floor regime for the project was final... Subscribers only field
Freemium Only 2014 Unlock with a freemium account Ofgem approved the project, the developers now hav... Subscribers only field