Rio-Antirrio 2019 Interconnector

Rio-Antirrio 2019

Substation information missing.

Substation to Converter cabling information missing.

Converter information missing.

Landfall to Converter cabling information missing.

Landfall to Converter cabling information missing.

Converter information missing.

Substation to Converter cabling information missing.

Substation information missing.

Greece
Greece

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Greece

Subsea Cabling

Cable Name Rio-Antirrio 2019
Cable Type
Cable Current HVDC
Status Partial Generation/Under Construction
Status Comments submarine part of the 400kV Acheloos-Distomo transmission line. The first 400kV submarine cable. Also called "Corridor A"
Capacity MW
Cable Tech
Total Length of Cable
Length Submarine 3.00 km
Length Land
DC Voltage 400 kV
AC Voltage
Configuration Monopolar
Project Cost Mill 105.00 Mill
Project Cost Currency EUR
Website Visit
Project Comments

Country & Landfall 2

Country
Greece
EPC(I)-Cabling
Stakeholder
Description
Installer-Cabling
Stakeholder
Description
Installer-Onshore Cabling
Stakeholder
Description
Manufacturer-Cabling
Stakeholder
Description
Manufacturer-Onshore Cabling
Stakeholder
Description
Owner-Offshore Transmission
Stakeholder
Description
Vessel-Cable Installation
Stakeholder
Description
Vessel-Export Cable Installation(burial)
Stakeholder
Description
Vessel-Protection(Mattressing etc)
Stakeholder
Description
Vessel-Route Clearance(PLGR)
Stakeholder
Description
Date Event Description
Freemium Only 2019 Unlock with a freemium account Subscribers only field
Freemium Only 2019 Unlock with a freemium account Laying of submarine cable has been successfully co... Subscribers only field
Freemium Only 2019 Unlock with a freemium account Cable installation has started.... Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore