10 Sep 2023: University of Aberdeen intends to install 49 moorings and equipment within the Beatrice, Moray East, Moray West and Caledonia Windfarm areas. The moorings will remain in place for approximately 6 months and will support acoustic loggers that record echolocation clicks of dolphins and porpoises and broad-band sound recorders. All are subsurface moorings that extend no more than 6 m vertically from the seabed. The moorings will not be surface marked. All installation works will be carried out by Moray First Marine Ltd., using MV “Waterfall”. These works are expected to commence between the 15th and 30 th August 2023 and the total duration of the installation campaign is not expected to exceed 10 days, subject to weather. The order of deployments will be dependent on weather and tidal conditions.
Location:
United Kingdom
Status:
Concept/Early Planning
Capacity:
2000 MW
4C Offshore | Location Map: Lat(58.197) Lon(-2.487)

Subscribers can track wind farms on their dashboard.

General Information
Name
Caledonia Offshore Wind Farm
Other Names
Plan Option Area NE4; 2 GW Caledonia Offshore Wind Farm
Country
United Kingdom
Development Status
Concept/Early Planning
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Moray Offshore Renewables Ltd (MORL)

Moray Offshore Renewables Ltd (MORL)

Owner

Ocean Winds

Ocean Winds


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
2000 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
58.197371°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
6
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life