19 Dec 2022: On December 19, Three Gorges Energy Jiangsu Dafeng 800MW offshore wind power project pre-thematic EPC project was tendered. It includes 4 sites: Dafeng H8-1# site, Dafeng H9# site, Dafeng H15# site and Dafeng H17# site. The scope of the tender includes but is not limited to: topographic survey, geological survey and marine hydrographic observation during the feasibility study stage of the Three Gorges Energy Jiangsu Dafeng 800MW Offshore Wind Power Project, preparation and evaluation of the feasibility study report, preparation and evaluation of the pre-project thematic reports on sea area, environmental assessment, navigation and stability assessment, preparation and approval of the project application report, up to project approval.
Location:
China
Status:
Concept/Early Planning
Capacity:
200 MW
4C Offshore | Location Map: Lat(33.208) Lon(121.272)

Subscribers can track wind farms on their dashboard.

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
200 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
East China Sea
Latitude
33.208088°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life