Guangdong Yudean Zhanjiang Wailuo-phase 2 Offshore Wind Farm

07 Dec 2021: Zhanjiang Wailuo phase 2 has been fully commissioned, which marks the fully commission of Zhanjiang Wailuo phase 1, 2, and 3.
Location:
China
Status:
Fully Commissioned
Capacity:
200 MW
4C Offshore | Location Map: Lat(20.585) Lon(110.650)

Subscribers can track wind farms on their dashboard.

General Information
Name
Guangdong Yudean Zhanjiang Wailuo-phase 2
Other Names
广东粤电湛江外罗海上风电项目二期
Country
China
Development Status
Fully Commissioned
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Guangdong Electric Power Development Co., Ltd (广东电力发展股份有限公司)

Guangdong Electric Power Development Co., Ltd (广东电力发展股份有限公司)

EPC(I)-Turnkey Windfarm

PowerChina Huadong Engineering (中国电建华东勘测设计研究院)

PowerChina Huadong Engineering (中国电建华东勘测设计研究院)

EPC(I)-Turnkey Windfarm

Jiangsu Longyuan Zhenhua Marine Engineering Co, Ltd(江苏龙源振华海洋工程有限公司)

Jiangsu Longyuan Zhenhua Marine Engineering Co, Ltd(江苏龙源振华海洋工程有限公司)

Owner

Guangdong Yudean Group Co.,Ltd. (广东省粤电集团有限公司)

Guangdong Yudean Group Co.,Ltd. (广东省粤电集团有限公司)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
200 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
South China Sea
Latitude
20.584614°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life