Developers/Owners/Operators (3)

Turbines (3)

RoleOrganisation 
Installer-Turbine
Saipem SpA
Client: LogIn
correct
Manufacturer-Turbine correct
Manufacturer-Turbine(Tower)
Navacel
Client: LogIn
correct

Substations (1)

Foundations (12)

RoleOrganisation 
Contractor-Heavy Load Logistics(Foundation)
OHT Management AS
correct
Designer(Detailed)-Foundation(Turbine)
NGI
correct
Installer-Foundation(turbine) correct
Installer-Foundation(turbine)
OHT Management AS
Client: LogIn
correct
Manufacturer-Foundation(anchor) correct
Manufacturer-Foundation(anchor) correct
Manufacturer-Foundation(anchor) correct
Manufacturer-Foundation(turbine) correct
Manufacturer-Foundation-Secondary Steel(turbine)
Euskal will produce all the flanges for the project. The flanges have an outside diameter between 6,500 mm and 7,500 mm; ring rolling weight between 9,000 kg and 24,000 kg.
Number of foundations: LogIn
correct
Manufacturer-Transition Piece-Primary Steel(turbine)
Navacel
Client: LogIn
correct
Supplier-Crane(Transition Piece) correct
Transport-Foundation
Technip Norge AS
Client: LogIn
correct

Array Cabling (2)

Export Cabling (3)

Met Masts (1)

Consultants (6)

RoleOrganisation 
Consultant-EIA correct
Consultant-Other correct
Consultant-Other correct
Consultant-Other
SgurrEnergy Ltd (Wood Group)
correct
Consultant-Other
Aibel AS
Client: LogIn
correct
Consultant-Weather Forecasting
Partrac Ltd
Client: LogIn
Statoil contracted Partrac to install a wave buoy on the site. The buoy is to remain in place for a year.
correct

Others (12)

RoleOrganisation 
Contractor-Other correct
Designer-FEED
Aibel AS
Client: LogIn
correct
Manufacturer-Other
Younicos AG
Client: LogIn
correct
Port Services
Norsea AS
Client: LogIn
correct
Project Management-Other
Technip Norge AS
Client: LogIn
correct
Supplier-Other
Strainstall UK Ltd
Client: LogIn
correct
Supplier-Other
Bardot Group
Client: LogIn
correct
Supplier-Other correct
Supplier-Other
Pioma Odlewnia will supply casting for the wind turbine tower mooring systems. This order for the Hywind project involves preparing and delivering three components: Cradle, Chain Stopper and Guide Roller castings, which are elements of the mooring system for floating turbines.
correct
Supplier-Other correct
Surveyor-Geotechnical correct
Surveyor-Metocean
Partrac Ltd
Client: LogIn
correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
123
StatusName
Decommissioned Beatrice Demonstration Beatrice Demonstration
Decommissioned Blyth Blyth
Fully Commissioned Barrow Barrow
Fully Commissioned Blyth Offshore Demonstrator Project - Array 2 Blyth Offshore Demonstrator Project - Array 2
Fully Commissioned Burbo Bank Burbo Bank
Fully Commissioned Burbo Bank Extension Burbo Bank Extension
Fully Commissioned Dudgeon Dudgeon
Fully Commissioned Galloper Galloper
Fully Commissioned Greater Gabbard Greater Gabbard
Fully Commissioned Gunfleet Sands Gunfleet Sands
Fully Commissioned Gunfleet Sands 3 - Demonstration Project Gunfleet Sands 3 - Demonstration Project
Fully Commissioned Gwynt y Môr Gwynt y Môr
Fully Commissioned Humber Gateway Humber Gateway
Fully Commissioned Hunterston Test Centre - Mitsubishi 7MW (onshore) Hunterston Test Centre - Mitsubishi 7MW (onshore)
Fully Commissioned Hunterston Test Centre - Siemens 6MW (onshore) Hunterston Test Centre - Siemens 6MW (onshore)
Fully Commissioned Hunterston Test Centre (onshore) Hunterston Test Centre (onshore)
Fully Commissioned Hywind Scotland Pilot Park Hywind Scotland Pilot Park
Fully Commissioned Inner Dowsing Inner Dowsing
Fully Commissioned Kentish Flats Kentish Flats
Fully Commissioned Kentish Flats Extension Kentish Flats Extension
Fully Commissioned Levenmouth demonstration turbine Levenmouth demonstration turbine
Fully Commissioned Lincs Lincs
Fully Commissioned London Array London Array
Fully Commissioned Lynn Lynn
Fully Commissioned North Hoyle North Hoyle
Fully Commissioned Ormonde Ormonde
Fully Commissioned Race Bank Race Bank
Fully Commissioned Rhyl Flats Rhyl Flats
Fully Commissioned Robin Rigg Robin Rigg
Fully Commissioned Scroby Sands Scroby Sands
Fully Commissioned Sheringham Shoal Sheringham Shoal
Fully Commissioned Teesside Teesside
Fully Commissioned Thanet Thanet
Fully Commissioned Walney Phase 1 Walney Phase 1
Fully Commissioned Walney Phase 2 Walney Phase 2
Fully Commissioned Wave Hub Wave Hub
Fully Commissioned West of Duddon Sands West of Duddon Sands
Fully Commissioned Westermost Rough Westermost Rough
Partial Generation/Under Construction Rampion Rampion
Partial Generation/Under Construction Walney Extension Walney Extension
Under Construction Aberdeen Offshore Wind Farm (EOWDC) Aberdeen Offshore Wind Farm (EOWDC)
Under Construction Beatrice Beatrice
Under Construction East Anglia ONE East Anglia ONE
Under Construction Hornsea Project One Hornsea Project One
Pre-Construction Hornsea Project Two Hornsea Project Two
Consent Authorised Blyth Offshore Demonstrator Project - Array 3A & 4 Blyth Offshore Demonstrator Project - Array 3A & 4
Consent Authorised Dogger Bank - Creyke Beck A Dogger Bank - Creyke Beck A
Consent Authorised Dogger Bank - Creyke Beck B Dogger Bank - Creyke Beck B
Consent Authorised Dogger Bank - Teesside A Dogger Bank - Teesside A
Consent Authorised Dounreay Trì Dounreay Trì
123
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at http://www.4coffshore.com/windfarms/organisations.aspx?windfarmID=uk76.