Status:
Development Zone
Capacity:
1830 MW
Location:
Denmark

As an Offshore Wind Farm Subscriber, you can follow this project to add it to your dashboard.

Follow this project


General Information
Name
Bornholm II
Country
Denmark
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account
Region
Subscribers only field
Comments
Subscribers only field
Website
Subscribers only field

Developers/Owners/Operators
Type
Organisation

Key Dates
Park Construction Starts
Subscribers only field
Offshore Construction Starts
Subscribers only field
Submitted For Consent
Subscribers only field
Consent Authorised
Subscribers only field
Financial Close
Subscribers only field
First Power
Subscribers only field
Full Commissioning
Subscribers only field

Costs
Stated project cost
Subscribers only field
Revenue mechanism
Subscribers only field
Revenue details
Subscribers only field

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
22 Jun 2020: The government and a broad majority in the Folketing signed an agreement on an ambitious climate plan on 22nd June. The agreement, together with the agreement on a green waste sector, forms the first part of the government's overall climate action plan. The agreement includes plans for: · Establishment of two energy Islands by 2030; one at Bornholm at 2 GW and one in the North Sea at 3 GW. The North Sea Island will be expanded to 10 GW in the long term. The island in the North Sea is being expanded in phases as electricity consumption rises and the energy island joins trade links with other countries. The energy islands must not only produce electricity, but also in the long term be able to connect technologies that can store or convert the green power to green fuels (so-called "Power-to-X"). It is a condition of the projects that they are profitable. Work on the energy islands will start immediately and parties involved will be continuously updated of the scheduling. · The establishment of the second wind farm agreed in the 2018 energy agreement will be located at Hesselø with a capacity of 1 GW. The parties have agreed that the wind farm should be operational by 2027 and have advanced the schedule compared to the original 2018 agreement. · The third wind farm agreed in the 2018 energy agreement will be included in the first phase of the energy islands and will be realised by 2030. · The funds reserved for the connection of second and third projects of the Energy Agreement 2018 will be re-prioritized to finance elements of the agreement. · The parties agree that DKK 4 million will be allocated in 2020, DKK 121 million in 2021 and DKK 89 million in 2022 for a preliminary study of the two energy islands and the park at Hesselø, at the same time with the re-prioritization of the funds allocated for preliminary studies of parks 2 and 3 of the Energy Agreement 2018. The preliminary studies are the first step in the establishment of the energy islands. · The energy islands and Hesselø must be based on the principles of the Energy Agreement 2018, which states that in future, offshore wind should be market-driven as far as possible without public support. · Other key points of the agreement include: promotion of Power-to-X plants and CO2 capture technology; electrification of the heating sector; Support for biogas and other green gases; Sustainability requirements for biomass for energy; Green restructuring of the industry; and Transition to market-driven expansion of solar cells and onshore wind. The so-called mill ceiling (maximum of 1,850 onshore wind turbines) will be postponed from 2030 to 2040 and CfD tenders for new onshore turbines and solar will be launched in 2020 and 2021. In total, the agreement between the government and the Left, DF, Radical Left, SF, the Unity List, Conservatives, Liberal Alliance and the Alternative, together with the climate agreement for waste, results in CO2e reductions of DKK 3.4 million tonnes by 2030.
Power & Turbines
Windfarm capacity
1830 MW
Turbine model
Unlock with a freemium account
Other turbine(s) used
Subscribers only field
Min. turbine capacity (MW)
Subscribers only field
Max. turbine capacity (MW)
Subscribers only field
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Subscribers only field
Total turbine height
Subscribers only field
Hub height
Subscribers only field
Rotor diameter
Subscribers only field
Foundation type
Unlock with a freemium account
Foundations on Wind Farm
Subscribers only field
Foundation comments
Subscribers only field

Location & Environment
Sea name
Baltic Sea
Latitude
54.776°
Longitude
Subscribers only field
Area
Unlock with a freemium account
Depth range (chart datum)
Subscribers only field
Depth range (stated by developer)
Subscribers only field
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Subscribers only field

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
Shared platform type
Subscribers only field
Grid connection point
Subscribers only field
Cable landing point
Subscribers only field

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Subscribers only field
Additional requirements (AC)
Subscribers only field
Nominal voltage (AC)
Subscribers only field
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Subscribers only field
Nominal voltage (DC)
Subscribers only field

Array Cables
Array cable length
Subscribers only field
Nominal voltage
Subscribers only field
Comments
Subscribers only field

Onshore Cables
Number of Onshore cables
Average length per cable
Unlock with a freemium account
Comments
Subscribers only field
Expected life
Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore