01 Apr 2024: Update March 2024: Expected tender criteria for AO6 Maximum aid budget of €4.12 billion over 20 years for an assumed market price of €36/MWh - less than 1/3 mobilized if electricity price at €100/MWh or difference of €30 /MWh between purchase price and average electricity prices Scoring criteria (out of 100 points): 1) The economic and financial value of the offer (75) - Price (70) - Robustness of the contractual and financial arrangemen (5) 2) Taking environmental issues into account (13) - Max num turbines (1) - Minimum amount that the Applicant undertakes to allocate (a) to EU ERC measures and environmental monitoring of the - Project excluding Decommissioning and (b) to the Biodiversity Fund (8) - Maximization of the rate of recycling, reuse or reuse of blades.(2) - Maximizing the rate of recycling, reuse or reuse of generator magnets. (2) 3) Taking into account social and territorial development issues (12) - Share of study and installation services that the Candidate undertakes to have carried out by SMEs.(4) - Share of upkeep, maintenance and operating services that the Candidate undertakes to have carried out by SMEs.(2) - Amount of financing or participative financing proposed for the installation.(2) - Commitments regarding the professional integration of people experiencing particular social or professional difficulties. (4) Other important aspects of the specifications - The 2 winners will be distinct - Maximum aid budget of €4.12 billion over 20 years for an assumed market price of €36/MWh - less than 1/3 mobilized if electricity price at €100/MWh or difference of €30 /MWh between purchase price and average electricity prices Criteria for admissibility of offers: - the power of each installation; - the maximum amount of the reference rate requested; - the maximum number of wind turbines proposed; - the minimum rate of recycling, reuse or re-use of blades, generator magnets, floats, anchors, masts and nacelles used for the project; - the minimum share of services for SMEs - the maximum threshold for the carbon assessment of the installation; - the maximum threshold of the carbon footprint of transport on site during maintenance; Update April 2023: Specifications for the tender are expected in September 2023 with awards delayed to April 2024. Award is expected in 2024, with tender taking place in end-2023, as of February 2023.
Location:
France
Status:
Development Zone
Capacity:
250 MW
4C Offshore | Location Map: Lat(43.024) Lon(3.578)

Subscribers can track wind farms on their dashboard.

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about 4C Offshore
Power & Turbines
Windfarm Capacity
250 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Mediterranean Sea Western Basin
Latitude
43.023917°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life