21 May 2021: Update May 21st: the Ministry of Ecological Transition issued its decision on the follow-up of the debate for continuation of the project. An area of 130 km2 was identified for the first 250 MW tender, and the zone will be gradually reduced during the competitive tendering procedure, taking into account the results of the technical and environmental studies that will be carried out there by the State and RTE and the continued consultation with the users of the sea. The debate also concluded a 233 km2 area for the later 500 MW extension project. The consultation procedures for the connection in shared alternating current for two parks, of approximately 250 megawatts then of 500 megawatts maximum, and the procedures for obtaining authorizations, will be initiated by RTE. The public debate closed on 21st December. Two months after the close of the public debate, the Chairman of the special public debate committee publishes a report containing all the opinions and arguments expressed. his report is accompanied by an assessment of the debate established by the president of the National Commission for Public Debate. Three months after the publication of the report, the contracting authority (Ministry of Ecological Transition, RTE and Brittany Region) will indicate the follow-up given to the project, and the lessons learned from the public debate. This decision is made public.
Location:
France
Status:
Development Zone
Capacity:
500 MW
4C Offshore | Location Map: Lat(47.325) Lon(-3.659)

Subscribers can track wind farms on their dashboard.

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
500 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Atlantic Ocean
Latitude
47.324737°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life