Les éoliennes flottantes de Groix & Belle-Île Offshore Wind Farm

Status:
Consent Authorised
Capacity:
28.5 MW
Location:
France

As an Offshore Wind Farm Subscriber, you can follow this project to add it to your dashboard.

Follow this project


General Information
Name
Les éoliennes flottantes de Groix & Belle-Île
Other names
Appel à projets - Fermes pilotes éoliennes flottantes Groix
Country
France
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account
Region
Subscribers only field
Comments
Subscribers only field
Website
Subscribers only field

Developers/Owners/Operators
Type
Organisation
Owner (25.5% stake)
Owner (25.5% stake)
Owner (24.5% stake)
Owner (24.5% stake)
Owner-Offshore Transmission

Key Dates
Park Construction Starts
Subscribers only field
Offshore Construction Starts
Subscribers only field
Submitted For Consent
Subscribers only field
Consent Authorised
Subscribers only field
Financial Close
Subscribers only field
First Power
Subscribers only field
Full Commissioning
Subscribers only field

Costs
Stated project cost
Subscribers only field
Revenue mechanism
Subscribers only field
Revenue details
Subscribers only field
Revenue (MWh)
240
Revenue (EUR/MWh)
240

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
09 Apr 2020: The order of April 9th 2020 set out the conditions for the power purchase agreement of all the floating wind projects in France having at most four wind turbines. Based on this order, winners of the call for projects "Appel à projets - Fermes pilotes éoliennes flottantes" launched in August 2015 by the French Environment and Energy Management Agency (ADEME) will benefit from a power purchase contract of EUR 240/MWh for a period of 20 years. Based on Article 4, the price level of an awarded power purchase contract will be subject to review ten years after the commissioning date. A potential decrease of the power purchase price aims to ensure that beyond the 8.5% (after taxes) Internal Rate of Returns (IRR) of the project, any additional gains are equally shares between the State (50%) and the developer/producer (50%), taking into account the changes on the economic operating conditions during installation. Based on Article 5, winners of the 2015's ADEME auction will have to request for a power purchase contract following the provisions of articles R. 314-3 and R. 314-4 of the energy code, including: i) a copy of the 2015's ADEME's decision; ii) the number of the planned wind turbines; iii) the planned capacity of the project, meaning the multiplication of the wind turbine units by their nominal power output; iv) the maximum active power supply produced by all the installed wind turbines, and, if applicable, the maximum active self-consumption power required v) the geographic location of each wind turbine using the WGS84 system. Based on Article 6, In the case when a developer modifies the initial proposed power purchase contract, then the developer will have to send a request for modification, including the characteristics subject to the modifications. The modification request can only be related to the following elements within the limits set by article R 314-5 of the energy code: i) information of the new developer/owner; ii) the number of the wind turbines; iii) a at most 30% decrease of the installed power, capacity, maximum active power supply, if applicable a modification on the maximum active self-consumption power as defined in Article 4 (of April 9th, 2020 Order) ; iv) change of the geographic location of a wind turbine unit (including an updated file with the geographic location of all wind turbines using the WGS84 system).
Power & Turbines
Windfarm capacity
28.5 MW
Turbine model
Unlock with a freemium account
Other turbine(s) used
Subscribers only field
Min. turbine capacity (MW)
Subscribers only field
Max. turbine capacity (MW)
Subscribers only field
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Subscribers only field
Total turbine height
Subscribers only field
Hub height
Subscribers only field
Rotor diameter
Subscribers only field
Foundation type
Unlock with a freemium account
Foundations on Wind Farm
Subscribers only field
Foundation comments
Subscribers only field

Location & Environment
Sea name
Atlantic Ocean
Latitude
47.49°
Longitude
Subscribers only field
Area
Unlock with a freemium account
Depth range (chart datum)
Subscribers only field
Depth range (stated by developer)
Subscribers only field
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Subscribers only field

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
0
Shared platform type
Subscribers only field
Grid connection point
Subscribers only field
Cable landing point
Subscribers only field

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Subscribers only field
Additional requirements (AC)
Subscribers only field
Nominal voltage (AC)
Subscribers only field
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Subscribers only field
Nominal voltage (DC)
Subscribers only field

Array Cables
Array cable length
Subscribers only field
Nominal voltage
Subscribers only field
Comments
Subscribers only field

Onshore Cables
Number of Onshore cables
3 km
Average length per cable
Unlock with a freemium account
Comments
Subscribers only field
Expected life
Subscribers only field