Les éoliennes flottantes de Groix & Belle-Île Offshore Wind Farm

Status:
Consent Authorised
Capacity:
28.5 MW
Location:
France

Subscribers can track wind farms on their dashboard



General Information
Name
Les éoliennes flottantes de Groix & Belle-Île
Other names
FEFGBI; Appel à projets - Fermes pilotes éoliennes flottantes Groix
Country
France
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account
Region
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Website
Upgrade your subscription to include Wind Farms or Cable unlock

Developers/Owners/Operators
Type
Organisation
Operator-Offshore Transmission
Owner (25.5% stake)
Owner (25.5% stake)
Owner-Offshore Transmission

Offshore Construction Starts
Upgrade your subscription to include Wind Farms or Cable unlock
Submitted For Consent
Upgrade your subscription to include Wind Farms or Cable unlock
Consent Authorised
Upgrade your subscription to include Wind Farms or Cable unlock
Financial Close
Upgrade your subscription to include Wind Farms or Cable unlock
First Power
Upgrade your subscription to include Wind Farms or Cable unlock
Full Commissioning
Upgrade your subscription to include Wind Farms or Cable unlock

Revenue mechanism
Upgrade your subscription to include Wind Farms unlock
Revenue details
Upgrade your subscription to include Wind Farms unlock
Revenue (MWh)
240
Revenue (EUR/MWh)
240

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
09 Apr 2020: The order of April 9th 2020 set out the conditions for the power purchase agreement of all the floating wind projects in France having at most four wind turbines. Based on this order, winners of the call for projects "Appel à projets - Fermes pilotes éoliennes flottantes" launched in August 2015 by the French Environment and Energy Management Agency (ADEME) will benefit from a power purchase contract of EUR 240/MWh for a period of 20 years. Based on Article 4, the price level of an awarded power purchase contract will be subject to review ten years after the commissioning date. A potential decrease of the power purchase price aims to ensure that beyond the 8.5% (after taxes) Internal Rate of Returns (IRR) of the project, any additional gains are equally shares between the State (50%) and the developer/producer (50%), taking into account the changes on the economic operating conditions during installation. Based on Article 5, winners of the 2015's ADEME auction will have to request for a power purchase contract following the provisions of articles R. 314-3 and R. 314-4 of the energy code, including: i) a copy of the 2015's ADEME's decision; ii) the number of the planned wind turbines; iii) the planned capacity of the project, meaning the multiplication of the wind turbine units by their nominal power output; iv) the maximum active power supply produced by all the installed wind turbines, and, if applicable, the maximum active self-consumption power required v) the geographic location of each wind turbine using the WGS84 system. Based on Article 6, In the case when a developer modifies the initial proposed power purchase contract, then the developer will have to send a request for modification, including the characteristics subject to the modifications. The modification request can only be related to the following elements within the limits set by article R 314-5 of the energy code: i) information of the new developer/owner; ii) the number of the wind turbines; iii) a at most 30% decrease of the installed power, capacity, maximum active power supply, if applicable a modification on the maximum active self-consumption power as defined in Article 4 (of April 9th, 2020 Order) ; iv) change of the geographic location of a wind turbine unit (including an updated file with the geographic location of all wind turbines using the WGS84 system).
Power & Turbines
Windfarm capacity
28.5 MW
Turbine model
Unlock with a freemium account
Other turbine(s) used
Upgrade your subscription to include Wind Farms unlock
Min. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Max. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Upgrade your subscription to include Wind Farms or Cable unlock
Total turbine height
Upgrade your subscription to include Wind Farms unlock
Hub height
Upgrade your subscription to include Wind Farms unlock
Rotor diameter
Upgrade your subscription to include Wind Farms unlock
Foundation type
Unlock with a freemium account
Foundations on Wind Farm
Upgrade your subscription to include Wind Farms or Cable unlock
Foundation comments
Upgrade your subscription to include Wind Farms unlock

Location & Environment
Sea name
Atlantic Ocean
Latitude
47.49°
Longitude
Upgrade your subscription to include Wind Farms or Cable unlock
Area
Unlock with a freemium account
Depth range (chart datum)
Upgrade your subscription to include Wind Farms or Cable unlock
Depth range (stated by developer)
Upgrade your subscription to include Wind Farms or Cable unlock
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Upgrade your subscription to include Wind Farms or Cable unlock

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
0
Shared platform type
Upgrade your subscription to include Wind Farms or Cable unlock
Grid connection point
Upgrade your subscription to include Wind Farms or Cable unlock
Cable landing point
Upgrade your subscription to include Wind Farms or Cable unlock

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Additional requirements (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (DC)
Upgrade your subscription to include Wind Farms or Cable unlock

Nominal voltage
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock

Onshore Cables
Number of Onshore cables
3
Average length per cable
Unlock with a freemium account
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Expected life
Upgrade your subscription to include Wind Farms unlock

Copyright © 4C Offshore 2021

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore