Dieppe - Le Tréport Offshore Wind Farm

28 Nov 2022: Update November 2022: Dieppe Le Tréport wind farm has reached a new milestone by announcing the names of its major suppliers. As of July 2022 EMDT park is actively preparing its construction, subject to the lifting of the last appeals currently before the Council of State. All of the suppliers of the main components of the park (foundations, substation, inter-wind turbine cables) are currently being selected and will be officially announced autumn 2022. The firm order for turbines with Siemens Gamesa will be finalised by end-2022.
Location:
France
Status:
Consent Authorised
Capacity:
496 MW
4C Offshore | Location Map: Lat(50.149) Lon(1.121)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
496 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
English Channel
Latitude
50.149194°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
1
Average Length per Cable
Comments
Expected Life