Gode Wind 3 Offshore Wind Farm

26 Mar 2021: The Federal Maritime and Hydrographic Agency issued the planning approval decision for Gode Wind 3 on 26th March 2021. The plan approval decision includes 23 turbines (GOW03:11 turbines and GOW04: 13 turbines) with an output of 11 MW each, monopiles. The hub height of the wind turbines should be 125 m, the rotor diameter 200 m (total height 225 m). Approx 30 km 66 kV array cabling arranged as 4 strands with 5-7 turbines. An offshore substation will be located in GOW04 area based on a monopile structure with a maximum diameter of 11 m. The wind farm will connect to NOR-3-3/DolWin 6 (Kappa) due to be completed in 2023. The total grid capacity to be fed in is 241.75 MW.The wind farm is also to be implemented in 2023.  The project is made up of the two sub-projects "Gode Wind 03" and "Gode Wind 04", which were originally approved as independent projects with a plan approval decision of December 22, 2016 and an amendment permit of July 31, 2013, respectively.  The project owner was awarded a grid connection/subsidy in the 2017/2018 transitional tenders. The projects were merged in 2019 and renamed Gode Wind 3. Due to technological advancements since the first planning approval consents and merger Orsted applied for new consents.
Status:
Consent Authorised
Capacity:
241.75 MW
Location:
Germany

Subscribers can track wind farms on their dashboard



General Information
Name
Gode Wind 3
Other names
Gode Wind 03, Gode Wind 04, Gode Wind III, Gode Wind IV
Country
Germany
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account
Region
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Website
Upgrade your subscription to include Wind Farms or Cable unlock

Developers/Owners/Operators
Type
Organisation
Owner-Offshore Transmission

Offshore Construction Starts
Upgrade your subscription to include Wind Farms or Cable unlock
Submitted For Consent
Upgrade your subscription to include Wind Farms or Cable unlock
Consent Authorised
Upgrade your subscription to include Wind Farms or Cable unlock
Financial Close
Upgrade your subscription to include Wind Farms or Cable unlock
First Power
Upgrade your subscription to include Wind Farms or Cable unlock
Full Commissioning
Upgrade your subscription to include Wind Farms or Cable unlock

Revenue mechanism
Upgrade your subscription to include Wind Farms unlock
Revenue details
Upgrade your subscription to include Wind Farms unlock
Revenue
EUR 81/MWh (EUR 81/MWh)

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
Power & Turbines
Windfarm capacity
241.75 MW
Turbine model
Unlock with a freemium account
Other turbine(s) used
Upgrade your subscription to include Wind Farms unlock
Min. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Max. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Upgrade your subscription to include Wind Farms or Cable unlock
Total turbine height
Upgrade your subscription to include Wind Farms unlock
Hub height
Upgrade your subscription to include Wind Farms unlock
Rotor diameter
Upgrade your subscription to include Wind Farms unlock
Foundation type
Unlock with a freemium account
Foundations on Wind Farm
Upgrade your subscription to include Wind Farms or Cable unlock
Foundation comments
Upgrade your subscription to include Wind Farms unlock

Location & Environment
Sea name
North Sea
Latitude
54.037469°
Longitude
Upgrade your subscription to include Wind Farms or Cable unlock
Area
Unlock with a freemium account
Depth range (chart datum)
Upgrade your subscription to include Wind Farms or Cable unlock
Depth range (stated by developer)
Upgrade your subscription to include Wind Farms or Cable unlock
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Upgrade your subscription to include Wind Farms or Cable unlock

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
1
Shared platform type
Upgrade your subscription to include Wind Farms or Cable unlock
Grid connection point
Upgrade your subscription to include Wind Farms or Cable unlock
Cable landing point
Upgrade your subscription to include Wind Farms or Cable unlock

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Additional requirements (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (DC)
Upgrade your subscription to include Wind Farms or Cable unlock

Nominal voltage
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock

Onshore Cables
Number of Onshore cables
Average length per cable
Unlock with a freemium account
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Expected life
Upgrade your subscription to include Wind Farms unlock

Copyright © 4C Offshore 2021

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore