21 Jun 2021: Renewable Infrastructure Group (TRIG) has put operations on hold following stress fatigue identified in the Haliade 150-6MW turbines following routine inspections. The first batches of turbines have now been brought back online, in consultation with the authorities. The asset management team, with support from the Company's Managers, is working closely with the manufacturer to identify and put in place a solution that will allow the wind farm to resume operating for the long term. GE Renewable Energy is supporting turbine Operations & Maintenance (O&M) under a 10-year service agreement. TRIG noted that there is a contractual mechanism to protect lsot revenue while turbines are not operational, subject to a cap. TRIG does not expect that cap to be exceeded.
Location:
Germany
Status:
Fully Commissioned
Capacity:
396 MW
4C Offshore | Location Map: Lat(54.043) Lon(6.554)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
396 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
54.043061°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life