Status:
Development Zone
Capacity:
700 MW
Location:
Germany

As an Offshore Wind Farm Subscriber, you can follow this project to add it to your dashboard.

Follow this project


General Information
Name
N-10.2
Country
Germany
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account
Region
Subscribers only field
Comments
Subscribers only field
Website
Subscribers only field

Developers/Owners/Operators
Type
Organisation

Key Dates
Park Construction Starts
Subscribers only field
Offshore Construction Starts
Subscribers only field
Submitted For Consent
Subscribers only field
Consent Authorised
Subscribers only field
Financial Close
Subscribers only field
First Power
Subscribers only field
Full Commissioning
Subscribers only field

Costs
Stated project cost
Subscribers only field
Revenue mechanism
Subscribers only field
Revenue details
Subscribers only field

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
20 Dec 2019: The Federal Network Agency (BNetzA) confirmed the 2019 Network Development Plan (NEP) on 20th December 2019. BNetzA examined all proposed projects and feedback from the ten week public consultation held August-October 2019; over 800 statements were received. The BNetzA are also currently consulting on the accompanying draft strategic environmental assessment with results expected Q1 2020. The NEP comprises a total of 114 expansion and reinforcement measures, proposed by the German TSOs, which serve to secure electricity supply in the target year 2030 (or 2035) including reinforcement and expansion of the AC and DC network to transport power from offshore wind and avoid bottlenecks in the North-South grid. Eight offshore connection systems in the North and Baltic Seas will also be necessary by 2030 for the connection of offshore wind farms to meet the 20 GW by 2030 targets. The NEP features revisions to make it compatible with the offshore wind tender timeline included in the current version of the Site Development Plan (FEP) published by the Federal Maritime and Hydrographic Agency (BSH) in June 2019. According to NEP (January 2020) areas N-10.1 and N-10.2 will connect via NOR-10-1 using 525kV technology with a transmission capacity of 2 GW. Commissioning in 2030.
Power & Turbines
Windfarm capacity
700 MW
Turbine model
Unlock with a freemium account
Other turbine(s) used
Subscribers only field
Min. turbine capacity (MW)
Subscribers only field
Max. turbine capacity (MW)
Subscribers only field
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Subscribers only field
Total turbine height
Subscribers only field
Hub height
Subscribers only field
Rotor diameter
Subscribers only field
Foundation type
Unlock with a freemium account
Foundations on Wind Farm
Subscribers only field
Foundation comments
Subscribers only field

Location & Environment
Sea name
North Sea
Latitude
54.592°
Longitude
Subscribers only field
Area
Unlock with a freemium account
Depth range (chart datum)
Subscribers only field
Depth range (stated by developer)
Subscribers only field
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Subscribers only field

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
Shared platform type
Subscribers only field
Grid connection point
Subscribers only field
Cable landing point
Subscribers only field

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Subscribers only field
Additional requirements (AC)
Subscribers only field
Nominal voltage (AC)
Subscribers only field
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Subscribers only field
Nominal voltage (DC)
Subscribers only field

Array Cables
Array cable length
Subscribers only field
Nominal voltage
Subscribers only field
Comments
Subscribers only field

Onshore Cables
Number of Onshore cables
Average length per cable
Unlock with a freemium account
Comments
Subscribers only field
Expected life
Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore