14 Apr 2022: The Federal Maritime and Hydrographic Agency (BSH) published an expanded preliminary draft of the area development plan. Various changes to the layout and turbine density have been introduced, including maximising areas of 2 GW across Zones 3, 4 and 5. The FEP now identifies 46.7 GW across future tender areas. The FEP specifies which areas will be pre-examined before the tender and allocates the transmission systems. The BSH are proposing to re-route several connections to different border corridors and onshore connection points, as well as bringing commissioning dates forward. However, the TSOs argue that the changes could cause delays to projects which are already underway. Also the TSOs state that timescales for the necessary onshore grid upgrades are unrealistic, and because so many projects are scheduled for installation around 2029-2030 it puts considerable pressure on the supply chain. A further draft FEP is expected mid-2022.
Location:
Germany
Status:
Development Zone
Capacity:
1000 MW
4C Offshore | Location Map: Lat(55.070) Lon(6.326)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
1000 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
55.070099°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life