29 Oct 2021: TenneT has accelerated plans for offshore wind connections post-2030. The Wind Booster project, also referred to as the LanWin-Hub, is based on a modular distribution hub concept with a 6 GW capacity. Commissioning is envisaged for 2032, three years earlier than originally planned. The hub will connect windfarms in the LanWin cluster. According to the Area Development Plan (FEP), published by the BSH in late 2020, areas N-11 to N-13 have potential for 10 GW, and were originally designed with 2 GW point-to-point connections and commissioning by 2035 (Q1 2021 MOR). According to TenneT there are several configurations for which areas can be connected to the LanWin Hub. Preference will be given to layouts enabling direct connection between the Hub and windfarms, i.e. without intermediate substations and cables. The remaining 4 GW will most likely be connected with point-to-point connections by Amprion until 2033. Confirmation is needed in the FEP and NEP.
Location:
Germany
Status:
Development Zone
Capacity:
2000 MW
4C Offshore | Location Map: Lat(55.111) Lon(6.454)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
2000 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
55.111455°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life