North Sea Cluster - Nordsee Three Offshore Wind Farm

22 Feb 2022: Northland and its German partner, RWE announced the formation of a 1,333MW Nordsee Offshore Wind Cluster partnership encompassing Nordsee Two (430MW), Nordsee Three (420MW) and Nordsee Delta (480MW). The formation of the cluster is expected to allow the realization of synergies in development, construction as well as operating costs, leading to enhanced returns for the projects. In September 2021, Northland and RWE exercised their step-in rights to secure the lease for Nordsee Two, following a competitive auction that resulted in the winning bid being a zero bid. Northland and RWE also have similar step-in rights for Nordsee Three and Delta, which are expected to come to auction in 2023. Northland holds a 49% interest in the new partnership, with RWE holding 51%. The projects are expected to be developed and managed on a joint basis by both parties and are expected to achieve commercial operations between 2026 and 2028
Location:
Germany
Status:
Concept/Early Planning
Capacity:
400 MW
4C Offshore | Location Map: Lat(54.032) Lon(6.843)

Subscribers can track wind farms on their dashboard.

General Information
Name
North Sea Cluster - Nordsee Three
Other Names
Innogy Nordsee 1 Phase 3, North Sea Windpower 3 NSWP3, North Sea Cluster
Country
Germany
Development Status
Concept/Early Planning
Category or Round
Unlock with a freemium account
Region
Comments
Website

Developers/Owners/Operators
Type
Organisation
Developer
Owner

Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
400 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
54.032413°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life