Nordsee Cluster A - N-3.7 Offshore Wind Farm

31 May 2023: Update 23/06/2023: The permit applications were made public for consultation until 25th August. N-3.7 includes the construction and operation of a total of 16 x 15 MW offshore wind turbines with a hub height of 146.2 m LAT and a rotor diameter of 236 m. Total capacity with grid connection is 225 MW. It will use monopile foundations (max diameter of 11m) for the turbines, as well as 27 km of 66 kV array cables and an offshore substation with either monopile/jacket substructure. N-3.8 includes the construction and operation of a total of 30 x 15 MW offshore wind turbines with a hub height of 146.2 m LAT and a rotor diameter of 236 m. Total capacity with grid connection is 435 MW. It will use monopile foundations (max diameter of 11m) for the turbines, as well as 52 km of 66 kV array cables and an offshore substation with either monopile/jacket substructure. Foundation installation is expected to start Q3 2025. Installation of the offshore substation is expected to start Q1 2026. Array cable installation is expected to start Q1 2026. Turbine installation expected to start Q2 2026. Commissioning is expected to begin Q3 2026. Update 31/05/2023: RWE has submitted two permit applications for Nordseecluster A (site N-3.7 and N-3.8) to the BSH. Applications yet to be made available for consultation.
Location:
Germany
Status:
Consent Application Submitted
Capacity:
225 MW
4C Offshore | Location Map: Lat(54.045) Lon(7.062)

Subscribers can track wind farms on their dashboard.

General Information
Name
Nordsee Cluster A - N-3.7
Other Names
N-3.7, Nordsee Cluster Phase 1, Gode Wind
Country
Germany
Development Status
Consent Application Submitted
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

RWE Renewables Offshore Development Two GmbH

RWE Renewables Offshore Development Two GmbH

Operator-Offshore Transmission

Tennet Offshore GmbH

Tennet Offshore GmbH

Owner

RWE AG

RWE AG

Owner-Offshore Transmission

Tennet Offshore GmbH

Tennet Offshore GmbH


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
EUR 0/MWh (EUR 0/MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
225 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
54.044902°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life