4C Offshore Empowering Intelligence

First 1000 MW commercial offshore wind farm in India

14 May 2020: Update 14/05/20: The tender is further delayed. Update 23/11/2019: First tender postponed to March 2020; NIWE expresses need to complete environmental, geophysical and geotechnical assessments correctly before project can be tendered. NIWE recommends 4x250 MW, 2 x 500 MW or 1 x 1 GW tender. Update (24/06/19): The expectation is that the 1 GW Gujarat tender will be out around October/November, however further delays are anticipated. Update: tender process delayed and pushed back to 2019. A general election is to be held April-May 2019 but MNRE intend to still put out a tender during late Q1. As of May 2019 there is still no announcement, Tendering of project scheduled for second half of 2018.
Location:
India
Status:
Development Zone
Capacity:
1000 MW
4C Offshore | Location Map: Lat(20.723) Lon(71.740)

Subscribers can track wind farms on their dashboard.

General Information
Name
First 1000 MW commercial offshore wind farm in India
Other Names
Gujarat Zone B - First Offshore Windfarm Project in India (FOWPI)
Country
India
Development Status
Development Zone
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Owner

Ministry of New and Renewable Energy (MNRE)

Ministry of New and Renewable Energy (MNRE)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
1000 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Arabian Sea(TBC)
Latitude
20.723302°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life