11 Jan 2023: The second public consultation started. It was an online public as part of the planning process. The public were able to visit the consultation room and leave feedback. Changes to the project proposal include a change to monopile foundations instead to the gravity foundations originally proposed. The onshore substation is to be built around 3km east of Ardee and the route will be approximately 20km long. The preferred would be mainly under public roads and buried under ground. The project has moved further offshore to reduce the visual impact and the number of turbines reduced from 55 to 25 by using 15 MW turbines. Belfast and Rosslare are being considered as marshalling ports, as well as Mostyn in North Wales. Drogheda, Greenore Port and Kilkeel have potential facilities and are under consideration by the Project to support O&M activities. Crew Transfer Vessels are to be used.
Location:
Ireland
Status:
Concept/Early Planning
Capacity:
370 MW
4C Offshore | Location Map: Lat(53.918) Lon(-6.068)

Subscribers can track wind farms on their dashboard.

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
370 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Irish Sea
Latitude
53.918437°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
6
Average Length per Cable
Comments
Expected Life