21 Apr 2022: 21/4/2022: Renexia held a ceremony at the port of Taranto to celebrate commissioning of Beleolico. Update 8/3/2022: The third turbine has been installed. Commissioning expected Q2 2022. Update 2/12/2021: Wind farm is still under installation. Operations expected Q1 2022. Update: projects has hit delays, commissioning pushed back until early 2022. The project must be operational by 22nd July 2022 in order to receive FIT. Update: February 2019: Following financial close in December 2018, offshore construction is still expected in 2019. In July 2018, installation work was planned to begin in 2019, for a July 2020 commercial operation deadline, to qualify for the €161.70 per MWh feed-in tariff and €40/MWh grid connection premium.  Belenergia expected the ten Senvion 3.0M122 turbines to be fully commissioned by end of 2018, but the numerous administrative appeals lodged against the project, caused significant delays.
Location:
Italy
Status:
Fully Commissioned
Capacity:
30 MW
4C Offshore | Location Map: Lat(40.486) Lon(17.138)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
30 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Gulf of Taranto
Latitude
40.485755°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life