Fukushima Floating OffshoRe Wind FARm Demonstration Project (Forward) - phase 1

01 Jul 2021: The remaining 5 MW and 2 MW turbines and floating substation will be decommissioned in 2021. The Ministry of Economy, Trade & Industry (METI) has set a JPY 5 billion budget for carrying out the necessary decommissioning works. Decommissioning has been considered necessary due to low profitability. The 5 MW and 7 MW prototype turbines reportedly had initial troubles cumulating in low availability and low output as well as expensive operational and maintenance costs. The 2 MW turbine preforms well but is insufficient to improve the profitability of this project.
Location:
Japan
Status:
Decommissioned
Capacity:
2 MW
4C Offshore | Location Map: Lat(37.311) Lon(141.251)

Subscribers can track wind farms on their dashboard.

General Information
Name
Fukushima Floating OffshoRe Wind FARm Demonstration Project (Forward) - phase 1
Other Names
福島復興・浮体式洋上ウィンドファーム実証研究事業 2MW ふくしま未来; Fukushima Mirai; Fukushima Forward; Compact semi-sub floater for 2MW turbine
Country
Japan
Development Status
Decommissioned
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
JPY 22000/MWh (EUR 166.86/MWh)

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
2 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Pacific Ocean
Latitude
37.311076°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life