Goto City Floating Wind Farm

26 Nov 2022: Update: turbine installation for 2 units was completed recently and from the 25th to the 26th of November the first unit was towed by two tugboats from the intermediary installation site (north sea area of Kabashima) to the installation site, having sailed 10 km. Towing took approximately 10 hours. Unit hook-up occurred on or after the 26th. October 2022: First unit expected to be installed on-site in November 2022. Foundation (spar type) upending and turbine assembly (turbine installation atop the foundation) have begun at Kabashima, an intermediary site before tow-out to the project site (off Sakiyama).
Location:
Japan
Status:
Under Construction
Capacity:
16.8 MW
4C Offshore | Location Map: Lat(32.664) Lon(128.983)

Subscribers can track wind farms on their dashboard.

General Information
Name
Goto City
Other Names
五島市沖洋上風力発電事業 洋上(浮体式):五島市崎山沖・黄島沖 黄島沖浮体式洋上風力発電 Goto City Offshore Wind Power Generation LLC
Country
Japan
Development Status
Under Construction
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Goto Offshore Wind Power Generation LLC ごとう市沖洋上風力発電合同会社

Goto Offshore Wind Power Generation LLC ごとう市沖洋上風力発電合同会社

Owner

ENEOS Corporation (及びENEOS株式会社)

ENEOS Corporation (及びENEOS株式会社)

Owner

Osaka Gas

Osaka Gas

Owner

Kansai Electric Power Co., Inc (The) (関西電力株式会社)

Kansai Electric Power Co., Inc (The) (関西電力株式会社)

Owner

INPEX (国際石油開発帝石株式会社 )

INPEX (国際石油開発帝石株式会社 )

Owner

Chubu Electric Power Co., Inc.(中部電力株式会社)

Chubu Electric Power Co., Inc.(中部電力株式会社)

Owner

TODA Corporation (戸田建設株式会社)

TODA Corporation (戸田建設株式会社)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
JPY 36000/MWh (EUR 273.04/MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
16.8 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Goto-nada sea
Latitude
32.664447°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life